Laserfiche WebLink
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task#: 005 <br />Date : 14-Mar-2003 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Terror Creek Loadout <br />Permifrob # : C-83-059 <br />Abbreviation :none <br />Filename : C059-005 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewa104 <br />Task descdption :Compact Coal Material In On-Site Disposal Area <br />HOURLY EQUIPMENT COST <br />Horsepower: 220 <br />Compactor type :Reclamation Shift basis : 1 per day <br /> Utilization % Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : $44.95 NA <br />Operating cost/hour: $40.04 100 <br />Operator cosUhour : $24.01 NA <br />Total unit cosUhour : $109.00 Total fleet cosVhour : $109.00 <br />MATERIAL QUANTRIES <br />Loose Shrinkage Compacted <br />volume: 9,559 LCY factor: 0.870 volume: 8,316 CCY <br />Source of estimated volume :Map 5 -Assume 1'OverSAcres <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly orodudion = (W x S x L x C) / P <br />Compacted width per pass (W) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 8.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 5 passes <br />Unadjusted hourly unit production : 689.73 CGY/hr <br />Job Condition Correction Factors Souroe <br />Site altitude : 5,800 feet Altitude adjustment factor : 1.00 ~ (Cat HB) <br /> Job efficiency factor : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> <br /> Adjusted hourly unit production : 555.88 CCY/hr <br /> Adjusted hourly fleet production : 555.88 CCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 14.96 hours <br />Un ~ cost : $0.198 per CCY Total job cost : $1,631 <br />Machine description :CAT 8i5F <br />