My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53974
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:15 PM
Creation date
11/20/2007 3:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
10/21/2003
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 003 <br />Date : 03/14/2003 <br />User: JRS <br />State :Colorado Permifrob# : C-83-059 <br />County :Delta Abbreviation :none <br />Site :Terror Creek Loadout Fllename : C059-003 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description :Move Sediment Storage Plle for On-Site Disposal <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTRIES <br />Initial <br />volume : 1,500 <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 ; 3-shank ripper <br />Ownership cosUhour <br />Operating orosVhour <br />Ripper op. cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />t)tII1Zat10n °/v <br />$53.00 NA <br />$87.2f !00 <br />$0.00 0 <br />$24.01 NA <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$164.22 Total fleet cost/hour <br />Swell Loose <br />CCY factor : 1.735 volume : 1,702 LCY <br />Source of estimated volume :Map 5 and Page 2.05-3 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted howdy production : 700.0 LCY/hr <br />Matedal consistency description <br />Consolidated stocf~ile <br />Average push gradient : 0.00 <br />Average site altitude : 5,800 fey <br />Material weight : 2,700 Ibs/LCY <br />Weight description <br />Earth -Wet excavated <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.492 /LCY <br />Operator skill : 0.75 <br />Material consistency : f.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.90 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.85 <br />Blade type : 1.00 <br />Net correction : 0.48 <br />$164.22 <br />Source <br />Adjusted unit production : 333.95 LCYfhr <br />Adjusted fleet production : 333.95 LCYihr <br />Total job time : 5.10 Hours <br />Total job cost : $837 <br />
The URL can be used to link to this page
Your browser does not support the video tag.