My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53813
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:08 PM
Creation date
11/20/2007 3:55:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Coal Transportation - ACCESS PERMITS - Removed my MR108 6/29/04
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE HIGHWAY ACCESS PERMIT #399056 June 7, 1999 <br />Issued to Bowie Resources. Inc. <br />• TERMS & CONDITIONS (cont'd) <br />17. ^ is the responsibility of thr Permiuee to prevent all livestock from entering the State Highway right-of-way at this <br />access location. Any li~~rsmck that does enter the hiehwac right-of-way shall be the sole responsibility of the <br />Permiuee. <br />I8. In the eeem the landscaping hrcomes unsi~hth or considered to be a traffic hazard. The Department may require <br />that it be removed promptly by the Permiuee and at no cost to the Drpartment. <br />19. Landscaping shall not obstruct sight distance at any State Highway access point. <br />20. A full}• executed complete cop}• o(this permit must he on the lob site with the contractor at all times during the <br />construction. Failure to comply with this or an}• other construction requirement may result in the immediate <br />suspension of work h}• order of the department inspector or the issuing authority. <br />21. All materials. equipment, installation. construction and design, including the auxiliary lane(s) and intersection <br />improvement(s) within thr State Highway shall he in accordance with the following Department standard <br />references, as applicable: <br />(a) <br />(b) <br />(c) <br />(d) <br />(e) <br />(f) <br />• (g) <br />(h) <br />(i) <br />G) <br />Roadway Design Manual <br />Materials Manual <br />Construction Manual <br />Standard Specifications for Road and Bridge Construction, latest edition <br />Colorado Standard Plans(M & S Standards) <br />Manual on Uniform Traffic Con[rol Devices (,M.U.T.C.D.) for Streets and Highways and the <br />Colorado Supplement thereto <br />A Policy on Geometric Design of Highwa}•s and Streets, American Association of State <br />HighH•av and Transportation Officials (AASHTO). latest edition <br />Institute of Transportation Engineer's Trip Generation manual, latest edition <br />State Highway Access Code 2 CCR 601-1 <br />Roadside Design Guide <br />Some of the reference materials listed above (a through e) ma}• be purchased from: <br />Colorado Department of Transportation <br />Bid Plans Room <br />4201 East Arkansas Avenue <br />Denver, Colorado 80222-3400 <br />Telephone Number: (303) 757-9313 <br />The Access Code and Category Schedule may be purchased from: <br />The Public Record Corporation <br />717 17ih Street Suite 1620 <br />Denver, Colorado 80202 <br />Telephone Number: (303) 292-2575 <br />22. Survey markers or monuments found in state highway right-of-way must be preserved in their original positions. <br />Notif}• the Department at (970) 248-7220 immediately upon damage to or discovery of any such markers or <br />monuments at the work site. Any survey markers or monuments disturbed during the execution of this permit shall <br />be repaired and/or replaced immediately at the expense of the Permiuee. <br />23. The Permiuee, through a Colorado registered professional engineer shall provide design, construction, pavement <br />striping and signing plans to the Department for approval 45 days prior to commencement of any work for the <br />purposes of issuing a Notice to Proceed. Design plans must include but not limited to layout of speed change <br />• lanes, utiliq• locations, present and proposed drainage, present and proposed right-of-way lines, present and <br />proposed traffic control devices, and clear zone analysis. IPar. 4.9(14), 2 CCR 601-1 ]The design must be done at a <br />Level o(Service C for the twenty-year projected build out Design Hourly Volume. Tltis projected volume shall be <br />-~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.