My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53724
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:05 PM
Creation date
11/20/2007 3:53:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200622701
IBM Index Class Name
Permit File
Doc Date
5/15/2006
Doc Name
2006 NOI Cost Estimate
From
Jim Stark
To
Jim Burnell
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 6X5 <br />Date : 05 <br />User : JRS <br />Agency or organization name: <br />Colorado Division Of Minerals And Geology <br />Permit or other job action <br />:Notice of Intent X -2006- 227 -01 <br />Task description <br />Replace Topsoil from Stockpile to Drill pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU <br />orsepower <br />: 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Shift basis <br />: 1 perday <br />Attachment no. 2 : -shank ripper <br />Data source <br />: (CRG) <br />Utilization <br />Cost Breakdown <br />Ownership cost/hour $53.92 NA <br />Operating cost/hour : $75.29 100 <br />Ripper op.cosUhour: $0.80 10 <br />Operator cos/hour $32.53 N <br />Total unit cost/hour $162.54 Total fl I t cost/hour, <br />e <br />$162.54 <br />MATERIAL QUANTITIES <br />Initial <br />Swell Loose <br />volume: 1 8, 0 0 0 <br />BCY factor: 1.2 volume : <br />22,500 <br />LCY <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />i <br />Job Condition Correction Factors <br />I <br />Source <br />Average push distance : <br />Operator skill <br />7 5 feet : <br />0.75 <br />(avg.) <br />Unadjusted hourly production : <br />Material <br />al consistency : <br />1,017.1 LCY /hr <br />1 1.00 <br />(Cat HB) <br />Dozing method : <br />; 1.00 <br />(gen.) <br />Material consistency description <br />Visibility: <br />1.00 <br />(avg.) <br />Consolidated stockpile <br />Job efficiency: <br />0. 83 <br />(1shiWday) <br />Spoil pile: <br />0.8 0 <br />(fnd_� <br />Average push gradient: <br />Push gradient : <br />5.00 % (pos) <br />1 0.90 <br />(Cat HB) <br />Average site altitude : <br />Altitude : <br />7,800 feet Material weight <br />11.00 <br />(Cat H <br />: <br />0.90 <br />(Cat H <br />) <br />Material weight : <br />Blade type : <br />2,550 Ibs /LCY Net correction : <br />1 1.00 <br />(S/SU/U) <br />10.41 <br />Weight description <br />Earth - Dry packed <br />Adjusted unit production : <br />412.65 LCY /hr <br />Adjusted Fleet production : <br />412.65 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />1 Dozer(s) Total job time: <br />54. 53 Hours <br />Unit cost : <br />$0.394 /LCY Total job cost : <br />$8.863 <br />
The URL can be used to link to this page
Your browser does not support the video tag.