My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53724
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:05 PM
Creation date
11/20/2007 3:53:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200622701
IBM Index Class Name
Permit File
Doc Date
5/15/2006
Doc Name
2006 NOI Cost Estimate
From
Jim Stark
To
Jim Burnell
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 6X4 <br />Date : 0511512006 <br />User: JRS <br />State : Colorado <br />County : Routt <br />Site Big Elk Mine <br />PermiUjob# : JCC <br />Abbreviation: none <br />Filename : JJCC -6X4 <br />Agency or organization name Colorado Division Of Minerals And <br />Permit or other job action : Notice of Intent X- 2006 - 227 -01 <br />Task description: Regrade Trenches <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume: 2,800 BCY <br />Swell <br />factor <br />Horsepower: <br />Utilization % <br />$53.92 <br />NA <br />$75.29 <br />100 <br />$0.80 <br />10 <br />$32.53 <br />NA <br />$162.54 <br />Total <br />Horsepower: <br />310 <br />Shiftbasis: <br />i <br />1 perday <br />Data source : <br />(CRG) <br />I <br />i <br />I <br />I <br />et cost/hour: <br />$162,54 <br />Loose <br />1. volume: 3 <br />3,500 L <br />LCY <br />I <br />:ondition Correction Factors S <br />I <br />Source <br />Operator skill: ; <br />;0.75 § <br />Material consistency : 1 <br />1.10 <br />Dozing method : 1 <br />1.10 <br />Visibility: 1 <br />11.00 <br />§(1 <br />Job efficiency: 1 <br />1 0.83 S <br />Spoil pile : 1 <br />10.90 P <br />Push gradient : 1 <br />1.00 <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : -- T400.0 LCY /hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient: 0.00 % (I <br />Average site altitude : 7,800 feet <br />Material Weight: 2,650 Ibs/LCY <br />Weight description : <br />Decomp rock - 25% Rock, 75% Earth <br />JOB TIME AND COST -- <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.197 /LCY <br />Basic machine Cat DBR Series lI - 8SU <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3 -shank ripper <br />Ownership cost/hour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Adjusted unit production : 823.42 LCY /hr <br />Adjusted Fleet production : 823.42 LCY /hr <br />Total job time: '4.25 Hours <br />Total job cost : $ 691 <br />Ownership cost/hour <br />Operating cost/hour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Adjusted unit production : 823.42 LCY /hr <br />Adjusted Fleet production : 823.42 LCY /hr <br />Total job time: '4.25 Hours <br />Total job cost : $ 691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.