Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task #: 6X6 <br />Date: 0511512006 <br />User: JRS <br />State : Co l o r ado Permit/job# : JCC <br />County : Routt Abbreviation : none <br />Site Big Elk Mine Filename : JJCC -6X6 <br />Agency or organization name : Colorado Division Of Minerals And <br />Permit or other job action : Notice of Intent X- 2006 - 227 -01 <br />Task description : Replace Topsoil from stoc <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,400 BCY <br />Swell <br />factor <br />Utilization % <br />310 <br />Shift basis: <br />$53.92 <br />NA <br />$75.29 <br />100 <br />$0.80 <br />10 <br />$32.53 <br />NA <br />$162.54 <br />Total <br />I <br />Horsepower: <br />310 <br />Shift basis: <br />1 perday <br />Data source: <br />(CRG) <br />Attachment no. 2 <br />cost/hour: $962.54 <br />I <br />Loose <br />1.2 volume: 3,000 LCY <br />I <br />f <br />Source of estimated volume Division Estimate <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 1,400.0 LCY /hr <br />Material consistency description <br />Consolidated s tockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude: 7,800 feet <br />Material weight: 2, 550 Ibs /LCY <br />Weight description <br />Earth - Dry packed <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost : $0.259 /LCY <br />to Trenches <br />Basic machine: <br />Cat D8R Series 11- 8SU <br />Blade type <br />Semi - Universal <br />Attachment no. 1 <br />: ROPS Cab <br />Attachment no. 2 <br />: 3 -shank ripper <br />Ownership cost/hour <br />Operating COSUhour <br />Ripper op. cost/hour <br />Operator cost/hour <br />Total unit cost/hour <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />1 0.75 <br />(avg.) <br />Material consistency: <br />1.00 <br />(CatHB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />10.83 <br />(1 shitt/day) <br />Spoil pile: <br />0.80 <br />(fnd_rA <br />Push gradient : <br />1.00 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Material weight: <br />0.90 <br />(Cat HB) <br />Blade type : <br />1 1.00 <br />(S/SUAJ) <br />Net correction : <br />10.45 <br />Adjusted unit production <br />6 28.62 <br />LCY /hr <br />Adjusted fleet Production: <br />is <br />628.62 <br />I' <br />LCY/hr <br />.. <br />Total job time : <br />14.77 <br />'. ...... <br />Hours <br />Total job cost: <br />$776 <br />