Laserfiche WebLink
<br />NA <br />5.00 <br />C~CES Cost Estimating,Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 30-Jan-2002 Permit or job no.: M-2001-114 Site :Starks Quarry <br />User : ACS Abbreviation : none State :Colorado <br /> Filename : M714-000 County : Larimer <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or job action :New application, sandstone quarry <br /> <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br /> <br />001 -Mobilize and demobilize equipment needed far reclamation mobilize 4 8.0 $2, 476 <br /> <br />002 -Backfill rubble into highwall along soutwest side of permit area truckt 4 113.0 $37,719 <br /> <br />003 -Spread stockpiles soil from the quarry perimeters back over the mined ar dozer 1 92.0 $10,521 <br /> <br />004 -Revegetate quarry area revege 1 40.0 $9,177 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 253.0 $59,893 <br />inclutles inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />NA' <br />10.00 <br />not required (or eqp. operator serves as super.) <br />PROJECT MANAGEMENT- <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - NA` NA total = NA <br />'contingencies accounted for of task level TOTAL INDIRECT COST= $1Q918 <br />TOTAL BOND AMOUNT (direct + indirect) _ $70,87 t <br /> <br />TOTAL DIRECT COST' = $59,893 <br />% of direct total = $928 <br />_ <br />% of direct total = $629 <br />_ <br />NA NA total = NA <br />of direct total = $5,989 <br /> TOTALO&P= $7,547 <br />CONTRACT AMOUNT (direct -r O 8 P) _ $67,440 <br />NA NA total = NA <br />of cntr. NA total = $3,372 <br />