My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53481
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:54 PM
Creation date
11/20/2007 3:47:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001114
IBM Index Class Name
Permit File
Doc Date
2/6/2002
Doc Name
Reclamation cost estimate
From
DMG
To
Loukonen Bros. Stone Company
Section_Exhibit Name
Permit documents
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br /> <br />CIRCEB C st Estimating Bottwar <br />EOUIVMFNT MOBILIZATION/DEMOBILIZATION <br />PROJECT IDENTIFlCATION <br />Agency or organizat ion name :Colorado Division Ot Minerals Antl Geology <br />TaskA: 007 Slate:Colorado PermiVlob N:M-2001-114 <br />Date: 01/30/2002 County:Larimer Abbreviation:none <br />User: ACS Site:Starks Ouamy Filename: Mi14-001 <br />Permit or other job action :New APPlication, Santlstone Quarry <br />Task description : Mvbifize and demobilize equipment needed for reclamation <br />En DuENr TRANSDORT PIG COST Shin basis: 1 per day <br />Cost data Source : CRG Oafa <br />Truck hador description :Generic on-nigbway frock hector. 6x4, diesel powered. 400 HP <br />Truck nailer dascriMion: Generic 1Mdinp dp0.seneu4, dray deck equipment Uailer (25T, 50T, and 90T) <br />Available rig capacities: 0-25 Tons 26-50 Tons 51i TOns <br />Cost Breakdown' Ownership costlnour $2d.23 52832 530.84 <br />Operating cosMOUn $30.25 532.95 534.62 <br />Operator cosMour: $2654 $26.54 52854 <br />Helper cosuhouc 322J0 $22J0 $2270 <br />Total Unit CosMour: $103J1 311050 $114.69 <br />NON-ROADABLE EQUIPMENT <br />Machine WeighVunit Ownership Haul Rig <br />Description (Tons} CosVhr/unit CosVhrNntt <br />Fleet Size Haul Trip <br />(Nc. units) Cosvhr/Neet <br />Rehm Trip 00T permit <br />Cosuhrttleet CosVfleet <br /> <br />-Cal D]R-7SU 351] $4332 $110.50 1 5153.82 3110.50 50.00 <br /> <br />-Cat 3228E 2645 538.17 $11050 1 314866 $110.50 $000 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals: $302.49 $221.00 $0.00 <br />ROADABLE EQUIPMENT <br />Machine Total Fleet Size <br />Description CosMour/unit (NO. units) <br />Haul Trip <br />CosVltr/fleet <br />Return Trip <br />Cosuhrttleet <br /> <br />-Generic B-t0 cy sx4 354.85 2 510978 $109.78 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> c..ranraia~ Nn0 ]A S1aA. ]A <br />E ST CE dTIME <br /> Nearest ma jor city or town within protect area region : F1. Collins <br />T ~ rt CvH T'ma' Nom Total one-way travel tlistance: 25.0 miles <br /> Readable Roadable Average travel speed: 25.0 mph <br /> Equipment Equipment <br />Haul time(AOUrs)= 1.00 1.00 Total non-roadable mob/tlemob cost': 32,25692 <br />Return time (hours) = 1.00 1.00 'Iwo rcurp cops won lam rig <br />Loading time (hours) = tOp NA Total roadable mob/tlemob cost ° : 521955 <br />Unloading time (hours)= 1.00 NA one mmM Np,iw Faro rig <br />Subtotals= 4.00 2.00 <br />JOB TIME AND COST Total lob time: 8.00 hours <br />Total lob cost : 52,476 <br />
The URL can be used to link to this page
Your browser does not support the video tag.