My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -36- 003-2203 <br />- Observation and documentation of non-destructive pressure testing of <br />fusion seams and vacuum testing of extrusion seams and repairs. <br />The following sections present a detailed description of each of the above activities. <br />6.1.1 Conformance Testing <br />Geomembrane manufactured by Poly-Flex was installed in the OSA. A Golder <br />representative performed geomembrane conformance sampling at the Poly-Flex plant in <br />Grand Prairie, Texas. Samples were sent to Golder's geosynthetic laboratory in Duluth, <br />Georgia, for conformance testing. Geomembrane rolls were not used on the project unless <br />approved by Golder based on conformance test results. <br />~ Prior to 80-mil single-sided textured and 40-mil smooth geomembrane arrival to site, Golder <br />. performed 18 conformance tests at a frequency of one test per 126,638 square feet, exceeding <br />the minimum specified testing frequencies of one test per 150,000 squaze feet. One of the <br />conformance tests failed to meet the average thickness requirement of 80 mils. Golder <br />conducted additional conformance testing to bound the failing sample. The failing rolls were <br />rejected and not delivered to the project site. Conformance testing for the 80-mil single-sided <br />texture LLDPE used for Phase IVa construction met specifications. Results are presented in <br />Appendix K-1. <br />6.1.2 Deployment Monitoring <br />Geomembrane panel deployment monitoring performed by Golder included: <br />- Observation of panel surface condition and panel overlap; <br />- Assignment of panel numbers; <br />n <br />U <br />~wo~zzo3~ogoo~arca~osoz~oouza3.oaoo.oa~aom m~ Golder AsSOClateS <br />
The URL can be used to link to this page
Your browser does not support the video tag.