My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -35- 003-2203 <br />• 6.0 GEOSYNTHETIC CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by Golder for the geomembrane <br />installed in the Phase IVa Area, and the geosynthetics installed in the LDT and Underdrains. <br />hi accordance with the Golder CQA Plan, when a Golder monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Poly-Flex and/or CC&V. <br />When unsatisfactory test results identified a deficiency, Golder performed additional tests to <br />define the extent of the deficient azea. Poly-Flex corrected deficiencies to meet the <br />requirements of the specifications, and Golder retested and/or approved the corrected deficiency <br />prior to any additional related work. The following sections include discussions of the <br />deficiencies encountered. <br />6.1 Ore Storage Area Geomembrane <br />• CQA activities conducted by Golder during the installation of the 80-mil single-sided textured <br />LLDPE geomembrane in the Phase IVa OSA consisted of the following: <br />- Conformance sampling and testing of the geomembrane; <br />- Observation and approval of the SLF surface prior to deployment of 80 mil <br />single-sided textured LLDPE geomembrane in the OSA; <br />- Observation and documentation of geomembrane deployment, including <br />verifying sheet thickness and overlap and documenting panel layout; <br />- Observation of trial seam sample testing and documentation of results; <br />- Observation and documentation of field seaming; <br />- Identification of destructive seam sample test locations, observation of <br />destructive seam sample testing, and documentation of test results; <br />- Observation and documentation of geomembrane repairs; and, <br />• <br />i~oo~zza3waamcmrt.posozwo3zzoz.oaaa.oa~aom.ao~ Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.