My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2002 -25- 003-2203 <br />I • flexible-wall permeameter with back-pressure saturation and a constant rate of flow <br />(ASTM D5084, Method D). The fill was recompacted to the in-place density measured <br />during nuclear density tests and the corresponding moisture content (as determined from <br />oven-dried samples). The nucleaz density value measured in the field was corrected for <br />coazse particles according to ASTM D4718. Laboratory tests yielded coefficients of <br />permeability for the CQA samples from 2.7 x 10-~ cm/sec to 7.4 x 10-9 cm/sec, all of which <br />aze less than the specified maximum permeability of 1 x 10-6 cm/sec. The permeability test <br />results for the SLF aze presented in Appendix I-3 and summarized in Table 9. <br />4.1.6 Bulk Specific Gravity <br />Golder conducted one bulk specific gravity test of SLF at Golder's laboratory in Lakewood, <br />Colorado. Testing was performed in accordance with ASTM C127 for performing rock <br />corrections to the Proctor compaction tests. <br />• 4.2 Field Testing and Monitoring <br />Golder observed all fill operations in the Phase IVa Area to verify, when necessary, lift <br />thickness, adequate compaction, and acceptable moisture conditions. When Golder performed <br />nuclear density testing, holes made in the fill during testing were filled by tamping SLF into the <br />holes. Golder standazdized nucleaz gauges at the start of each day's work according to <br />ASTM D2922. <br />4.2.1 Underround Workings <br />Golder monitored remediation of underground workings, including verification that <br />excavations were performed to minimum required dimensions, and that CP, CR, geogrid, SF, <br />and SSF were installed as specified. <br />L~ <br />I:\00\2203\OGOp\CenRep0H02\00]22030000.06'/4pptdoc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.