My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 2002 -3- 003-2203 <br />• performed CQA laboratory testing of grain size, Atterberg limits, and <br />moisture content of the Underdrain Fill (UF) and SSF placed in the <br />Underdrains. <br />- Golder monitored construction of the Leak Detection Trench (LDT) and <br />the Leak Detection Sump (LDS), including verification that Ames <br />excavated the trench to minimum required dimensions and placed <br />materials as specified. Golder performed CQA laboratory testing of grain <br />size, Atterberg limits, and moisture content of the Leak Detection Fill <br />(LDF) placed in the LDT. <br />- Golder monitored site grading. Golder monitored slope reduction fill and <br />fill placement, including lift thickness, moisture conditioning, <br />temperatures, compactive effort, and use of suitable material for SF. <br />Golder performed CQA laboratory testing of grain size, Atterberg limits, <br />and moisture content of SF. <br />- Golder visually monitored subgrade preparation to confirm that the <br />subgrade surface was unyielding; free of organic matter and other <br />unsuitable materials, and that the subgrade surface was compacted prior to <br />Soil Liner Fill (SLF) placement. <br />• - Golder visually monitored the placement and compaction of SLF including <br />observation of depth verification performed by Ames, particle size, <br />moisture conditioning, and compaction of the fill. Golder performed <br />in-place density and moisture content testing, and performed CQA <br />laboratory testing of grain size, moisture content, Atterberg limits, <br />compaction, and permeability. Golder also provided visual monitoring of <br />the SLF surface prepazation and moisture conditioning for geomembrane <br />deployment, including verification that the surface was proof-rolled, <br />compacted, and hand-worked so as to be free of desiccation cracks, abrupt <br />grade changes, and sharp stones or objects. Golder also observed the <br />backfill and compaction of the anchor trenches. <br />- Golder visually monitored the placement of Drain Cover Fill (DCF) in the <br />OSA, including verification of lift thickness and grade control, <br />identification of deleterious materials, and verifcation that care was <br />exercised in fill placement to avoid geomembrane damage. Golder <br />performed CQA laboratory testing of grain size, Atterberg limits, and <br />moisture content of DCF. <br />- Golder monitored the ambient air temperatures and the temperature of all <br />fills, including SLF, in accordance with project specifications. <br />• <br />cwouzozioaomcwe~,ososoozzzo3.oaoo oa~aoacao~ Golder Associpfes <br />
The URL can be used to link to this page
Your browser does not support the video tag.