My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2002 -2- 003-2203 <br />• (OSA). All quantities and testing frequencies presented in this report aze current as of <br />August 2002, which represents complefion of the Phase Na Area, as detailed in this report. <br />1.2 Construction Quality Assurance/Quality Control <br />Golder provided CQA and CQC monitoring and testing services, and prepared this report <br />describing the monitoring and test results for the Phase Na Area activities. As-built drawings <br />and supporting CQA and CQC monitoring and testing documentation aze presented in <br />appendices attached to this report. <br />1.2.1 COA Monitoring of Earthworks <br />Golder provided CQC testing and CQA testing and monitoring of earthworks for the Phase Na <br />Area. CQA testing and monitoring of earthworks was provided for in-place materials in <br />• accordance with the Golder Earthworks CQA Plan. The earthworks material specifications for <br />this project are summarized in Table 1. CQC earthworks testing was provided to support the <br />contractor during the manufacture of materials and prior to material placement. The CQC test <br />results are not included in this report because these tests were intended to assist the contractor in <br />materials preparation rather than record testing. <br />Golder provided CQA laboratory and field testing, and monitored earthworks construction <br />activities as follows: <br />- Golder visually monitored and documented the remediation of <br />underground workings in the Phase Na Area footprint, including <br />verification that Ames excavated underground workings to the minimum <br />specified dimensions and then installed Coazse Shaft Backfill (CSB), <br />Concrete Plug (CP), Cemented Rockfill (CR), Select Structural Fill (SSF), <br />Structural Fill (SF), and geogrid as specified. <br />- Golder monitored construction of the Primary and Secondary Underdrains, <br />. including verification that Ames excavated trenches to minimum required <br />dimensions and grades, and placed materials as specified. Golder <br />1\00\2203\0000\CcnRry0802\OOJ2203.0400.041COrt.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.