My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2002 -1- <br />. 1.0 INTRODUCTION <br />003-2203 <br />The Cripple Creek & Victor Gold Mining Company (CC&V) currently operates the Cresson <br />Project, located in Teller County, Colorado, neaz the city of Victor on Colorado State <br />Highway 67. CC&V is a joint venture formed by Golden Cycle Goid Corporation and <br />Anglogold (Colorado) Corp. (Anglogold), with Anglogold the managing partner. The <br />Cresson Project is a mining and ore processing facility which is comprised of surface mines, <br />crushers, a lined Valley Leach Facility (VLF), gold recovery plant, and associated <br />infrastructure, all of which were designed and constructed to meet or exceed the requirements <br />established by C.R.S. §34-32-101 et seq. and regulations promulgated thereunder by the <br />Mined Land Reclamation Board (MLRB). The work associated with the Cresson Project is <br />being performed under specific criteria established in Amendment No. 8 of Permit Number <br />M-1980-244 (Permit), as approved by the MLRB. This Report documents the Construction <br />Quality Assurance (CQA) and Construction Quality Control (CQC) services provided by <br />Golder Associates Inc. (Golder) from February 2001 through August 2002 for the Phase IVa <br />Area <br />1.1 Project Description <br />The initial Cresson Project was designed in 1993 and constructed in phases since 1994 under <br />Amendment Nos. 6, 7, and 8 to Mining Permit M-1980-244. This certification report addresses <br />the addition of approximately 1,364,800 square feet plan azea (1,430,000 squaze feet, surface <br />azea corrected for slope) of lined valley leach area to the east of the Phase I VLF. This area is <br />referred to as the Phase IVa Area and was designed to meet the criteria presented in <br />Amendment No. 8. <br />Messrs. Ron Roberts, Terry Mandziak, and Jim Smith represented CC&V as the Construction <br />Managers for the 2001 and 2002 construction season. Earthwork was performed by Ames <br />• Construction Inc. (Ames) of Aurora, Colorado. Poly-Flex Inc. (Poly-Flex) of Grand Prairie, <br />Texas manufactured and installed the geomembrane used to construct the Ore Storage Area <br />~~oo~zzo3~aaoo~cercaeooeoz~ooazzo3 oaoo oa"/aoun.aoc Golder Associates <br />