Laserfiche WebLink
• escape route for underground activities. Secondary <br />ventilation pathway. <br />M-24 Smuggler Dump / Slide Dump - Source of material for <br />surface re-mining activities. <br />M-25 Silver Ore Tunnel Dump - source of material for surface <br />re-mining activities. <br />M-19 Smuggler Mine - Serving as an emergency entry and <br />escape route for underground activities. Secondary <br />ventilation pathway. <br />6. Surface Disturbance Dimensions <br />Significant disturbances to the surface will be of two types. <br />The two types are re-mining and processing. The re-mining of <br />existing dumps is an activity that will remove the remnants of <br />previous mining and restore the land to a similar contour and <br />condition found before any mining activities in the 1880's. <br />Processing will involve crushing, screen sizing of rock products <br />and the operation of the existing Heavy Media Plant. <br />• Disturbed <br />MaD I.D.# Activitv Acreage <br />MM16 Tailings Impoundment and Road .55 <br />M-21 Re-mine Mendota Dump & Store Aggregate 2.12 <br />M-23 Process Slide Dump .96 <br />M-24 Process Smuggler & Slide Dumps 1.92 <br />M-25 Process Silver Ore Tunnel Dump .60 <br />TOTAL DISTURBED ACRES: 6.15 <br />TOTAL PERMIT ACRES 9.09 <br />7. Road Dimensions and Usage <br />Existing roads from previous mining activity will be utilized and <br />will not require improvement. The roads to be used will include: <br />Mao I.D.# Activitv Road Dimensions <br />RR6 Mendota Mine Access, Equipment <br />Transport, Aggregate and Ore Removal 450'L X 20'W <br />• R-7 Mendota Mine Office Access 380'L X 12'W <br />8 <br />