COLORADODEPAR7MENIOFPUBLJCt1EALTHONMFM, A'aKr Quaary Connor DlvLs7an •
<br />Rarlonate -Page Z. Pmnit No. COO-Sa0M0
<br />1Xefederal e-Qluentguidelines thatgovern dischargesfrom sandandgravel miningjacililles (40 CFR 436) control mostsurfacerunoff
<br />from mining facilities. However, there are some sources ojstormwater from these sites which are not addressed, such as roads and
<br />railroad lines, pond outrlopes, inactive laadouh, sites used for storage and maintenance of material handling equipment, etc.
<br />For sand and gravel operations, other mining and quarrying ofnonmetaBic minerals exceptfuels, and jot asphalt and connete batch
<br />plane located at such facilities, this general permit wil/cover both the process water dischasges and stormwater discharges. Process
<br />water discharges. are addrused under Part I.B ojthe permit; stormwater discharges are addressed under Part I.C ojthe permit
<br />This will eliminate the need jot coverage under more than one permitfor mostsuch facilities. However, as discussed in Section 1!A,2.a
<br />of the Rationale, somefacilities may wish to applyfor an individual permit instead, in order to take advantage ajsome federal e-(fluent
<br />guidelines not inc/uded here. Additionany, as discussed in Section IHB ojthe Rationale, the Rater Quality Control Division of the
<br />Colorado Department ofPublicHealth and Environment (the "Division ") retains the authoriryto require anyfaciliry to be covered under
<br />an individual permit .
<br />III. COVERAGE UNDER THIS PERMIT
<br />A. Industrial Categories
<br />The types ofjaciltties covered by this permit include all mining and quarrying ojnonmetallic minerals, except fuels. This is the
<br />description ojStandard Industrial Class cation (SIC) Code ]4. Also, stormwarer from asphalt and concrete batch plants located
<br />at sand and gravel operations is included berg due to their similarity to tke covered mines in pollution potential, and their
<br />function as an adjunct to the mine operations. (The definition of asphalt and concrete Gatch plants can include the use of
<br />recycled asphalt or connete.) The categories include:
<br />SIC Code Lndustrv Twe SlC Codg Industry 7Sme
<br />141 Dimension stone 148 Nonmetallicmtneralsservices, exceptfuels
<br />141 Cncshed and broken stone (overburden removal, step minin& etc.)
<br />144 Sand and gravel 149 Miscellaneous nonmetallic minerals, except
<br />J4S Clay, ceramic, and refractory minerab fuels (asbestos, gems, frll din pits,
<br />147 Chemical andfertiltzer mineral mining graphite, gypsum, peat, pumice, talc, etc.)
<br />2951 Asphalt batch plane 3273 Concrete batch plane
<br />B. Exemptions for Small Municiaali,
<br />ThelntermodalSurfaceTransportahbn Efficiency Act ojl99l Section l068(cJ addedan exemption to thestormwaterregulations
<br />for municipalities with less than 100, DOOpopulation. The term "municipality"includes cities, towns, counties, specialdistricts or
<br />any entity created by orpursuant to State law.
<br />Stormwnter discharges associated with industrial activity (except for airports, steam electric power plants, or uncontrolled
<br />sanitarylandfr!/s), that are ownedor operated by a small municipality are not required to applyfororobtain a stormwaterpermit
<br />until March I0, 1003. This exemption is only for dtschasges of stormwater. (Note: This exemption does not apply to other,
<br />privately owned industries within the same smaAmunictpaliry.)
<br />IV. CERTIFICATION
<br />A. Permit Certr~ ti h ncaNonr
<br />This permit is made up ojseveral parts, some of which do not apply to all permitiees r.e., while most facilities will require
<br />coverage underthestormwatersectionl.C,manywtllnotrequtrecoverageundertheprocesswatersectionl.B). Thaejore,the
<br />individualcertlfrcationpreparedforeaclrapplicantwillindicatewhetherthatappllcantmustjollowPartl.Bojthepermit In all
<br />cases (except as noted in Section III.C, above), Part I.C must befo!lowed. (In the absence ojsuch indication from 1heDivision,
<br />the permiaee will be responsible for determining and then complying with the applicable sections in Part I.) In addition,
<br />~_ruermittee will be required to comply with Part I, subparts A, D, E and F, and all afPan H ojthe permit