Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.; Task Description Coat ($) <br /> <br />NA No Stream Channel Reconstruction Required $0 <br /> <br /> <br /> Subtotal (H}: <br /> <br />I. ------------ <br />EARTHWORK - SEDIMENT POND/DIVERSION DITCH/CHECK DAM REMOVAL <br />Task No.; Task Description Gost ($) <br />~~4~~ ~~~, ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~, <br />M1 <br />Y ~~~~~~~~~~4 <br />10 ; Backfill sediment and dugout pond ; $402 <br />NA Fill in ditches (Task will be accomplished during; <br /> removal of coal material and backfill of pad) $0 <br />12 Rill and Gully Repair ; <br /> ($41.57)(8 hours}(10 years) $3,326 <br /> <br /> <br /> , <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotal (I): $3,728 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.; Task Description Cost ($) <br />11 Replace topsoil $2,426 <br />, <br /> <br />Subtotal (J): $2,4`L6 <br />