Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 2 of 4 <br />D. EARTHWORK - FILL COMPACTION <br />Task No.; Task Description Coat ($) <br /> <br />5 ; Compact all coal waste material in disposal area ; <br /> ; before backfilling ; $2,743 <br /> <br /> <br /> <br /> <br /> Subtotal (D): $2,743 <br /> <br />E. <br />EARTHWORK - RIPPING - ----------- <br />Task No.; Task Description ; Cost ($) <br /> <br />6 ; Rip light use road B water tank, RR track, $205 <br /> ; and haul road ; <br /> <br /> <br /> <br /> <br /> . <br /> <br />Subtotal (E): $205 <br />M F. EARTHWORK - ROAD RECLAMATION <br />Task No.; Task Description ; Cost ($) <br /> <br />NA ; Break-up and dispose of asphalt material on-site ; $0 <br />; (See Task #24 - Structural Demolition) ; <br />NA ; Reclaim light use roads (See Task #6) ; $0 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotal (F) <br />G. EARTHWORK - FINISH GRADING <br />Task No.; Task Description ; Cost ($) <br />9 ; Finish grading before topsoil replacement ;~ $209 <br />Subtotal (G): $209 <br />