My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53051
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:37 PM
Creation date
11/20/2007 3:34:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 10 BOND CALCULATIONS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 4 <br /> Colorado Division of Minerals and Geology <br /> RECLAMATION COST SUMMARY FORM <br /> <br />• PERMIT ----------------------------- <br />NUMBER 0 834059 PREP. BY: 44CEJ4LM1 FILENAME: <br />C05940M14-4-4 <br />DATE 10-Nov-93 OPERATION:Terror Creek Loadout <br />PERMIT ACTION Permit Renewal <br />I. OIRECT <br />--------- <br />--------- COSTS <br />--------------------------------------------------- <br />--------------------------------------------------- <br />------------ <br />------------ <br />A. EARTHWORK - BACKFILLING & ROUGH GRADING <br />Task No.; Task Description Coat ($) <br /> <br />1 Remove coal material from pad $538 <br />NA Move coal material to disposal area on-site ; <br /> (included in Task #1) $0 <br />2 Backfill coal pad $23,831 <br />3 Move sediment storage pile for on-site disposal $244 <br />4 Move 50% of coal stockpile for on-site disposal $3,007 <br />NA Move concrete to on-site disposal area <br /> (See Task #24-Structural demolition) $0 <br />NA Move asphalt to on-site disposal area ; <br /> (See Task #24-Structural demolition) $0 <br />7 Move Railroad ballast to on-site disposal area $484 <br /> <br /> <br />w <br /> <br /> <br /> <br /> Subtotal (A): $28,104 <br /> <br />B. EARTHWORK - HIGHWALL REDUCTION ------------ <br />Task No.; Task Description Cost ($) <br /> <br />NA No Highwall Reduction Required ; <br /> <br /> <br /> <br /> Subtotal (B): <br /> <br />C. EARTHWORK - WASTE PILE COVER PLACEMENT ------------ <br />Task No.; Task Description Cost ($) <br />~ ~ <br />NA ; No Waste Pile Cover Replacement Required ; <br /> <br />~~~~~~~~1 ~~~~~~~~~~~~~~~~~~~~~~~~~~~4~~~~~~~~~~ 1 <br />Subtotal (C): ~~~~~~~~~~w~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.