Laserfiche WebLink
• Mine Area Seneca 11 <br />Project Facilities-Sad Pond 004 <br />Task Grade Pond Embankment <br />YORKSNEET N0. SP-1 <br />PRODUCTIVITY FOR DOZER USE - GRADING <br />Dozing Activity: Grade the pond embankment to allow flow-through drainage. <br />Dozer Used: D-11N, SU blade <br />Description of Dozing: [50~ push <br />Volume: 13.700 bcy <br />17.260 lcy <br />Productivity Calculations: <br />Operator: 75 <br />• Grade: see EMF <br /> Material Factor: see EMF <br /> Push Distance: see EMF <br /> Oozing Factor: see EMF <br /> Visibility: 90 <br /> Altitude: 91 <br /> Dual Tilt: 105 <br /> Spoil Pile Factor: see EMF <br /> Minutes corked per Hour: 50 <br /> Bank Material Density: see EMF <br /> Loose Material Density: see ENF <br /> Direct Drive Trans: 100 <br />Total Adj. Factor: 0.2979 <br />Cost per Hour E236.22 <br />Total Cost = 34 hrs. x 5236.22 cost/hr = EB 031 <br />REFERENCES: <br />As-built drawings <br />`J <br />