Laserfiche WebLink
Mine Aree Seneca 11 • <br />Project Facilities-Sad Pond 008 <br />Task Grade Pond Embankment <br />WORKSHEET NO. SP•2 <br />PRODUCTIVITY FOR D02ER USE - GR P.DING <br />Dozing Activity: Grade the pond embankment to allow floe-through drainage <br />Dozer Used: D-11N, SU blade <br />Description of Dozing: 150' push <br />Volume: 17,000 bcy <br />21.250 lcy <br />Productivity Calculations: <br />Operator: 75 <br />Grade: see ENF • <br />Material Factor: see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 100 <br />Spoil Pile Factor: see EMF <br />Minutes Worked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose NateriaL Density: see EMF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.2979 <br />Cost per Rour = 8236.22 <br />Total Cost = 42 hrs. x 8236.22 cost/hr = E9~921 <br />REFERENCES: <br />As-built drawings <br />• <br />