Laserfiche WebLink
Xine Area Seneca II <br />Project Facilities Deadhead Routes <br />Task Reclaim Routes <br />WORKSHEET N0. DH-1 <br />PRODUCTIVITY FOR EOUIPNENT USE <br />Earthmovin9 Activity: Assume that 8,000 ft. long x 150 ft. wide deadhead routes in <br /> either pit area will have to be reclaimed. <br />Ripping Production 150' x 8000' x 3' = 133,300 cy <br /> 2 <br />Grading Production 150' x 8000'/43560 ft <br />= 28 ac. <br />Topsoiling Producti on: 28 ac x 1.0 = 33.6 ac-ft or 54,200 cy (56,400 tons) <br />Production Basis: See FPC, ENF and worksheet <br />Ripping Costs: 133 .300 bcy/2522 bcy/hr = 53 hrs x f254_5~8 = 513.514 <br /> <br />Grading Costs: 28 ac/ 1.35/hr = 21 hrs x 5236.22 = 54.961 <br />Topsoiling Costs: 56. 400 tons x 50.756/ton = 542.638 <br /> <br />Seeding Costs: 370 /ac x 28 ac = 510.360 <br />Total Costs: f71 .473 <br />References: <br />See FPC, EMF and other worksheets for production <br />• i <br />