My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52689
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:23 PM
Creation date
11/20/2007 3:25:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
Permit File
Doc Date
11/19/1993
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />RECLAMATION PLAN <br /> <br />E}:HIBIT "E" <br />la) Description of the type of reclamation, reasons <br />earthmovinp related to reclamation. <br />ti) The entire pit area will be reclaimed as ~rangeland..~ <br />This use was. selected by the landowner as. being consistent <br />with the balance of his ownership adjar_ent to the affected <br />area. <br />(ii) Earthmoving in reclamation will be relatively ~;imple. <br />Backslopes will be finished at 3H:1V or flatter. Both the <br />pit floor and baekslopes will be topsoiled with 4" - 7" <br />available topsoil. These operations will be performed with <br />any combination of front-end loader., doers and/or scragers: <br />(b) Comparison of the proposed post-mining land use to other <br />land uses in the vicinity. <br />As stated in (a) (i), rangeland ic- the landowners' choice for <br />reclamation which is consistent with the balance of their <br />ownership in tF~is. area. Other land uses within a 1-1/~' mile <br />radius of the perimeter of the subject are rangeland with as- <br />sociated ranch houses and buildings, plus another clay mine <br />to the south. This portion of E1 Paso County is not covered <br />by the County zoning ordinance. Therefore, this. operation <br />would not be in conflict with the local guvernment rules and <br />regulations. <br />(cl Description of how the reclamation plan will be imple- <br />mented to meet applicable requirements of Rule 6-6-1 Grading_ <br />Ill B.acl;~;loping "backfilling" <br />Unused overburden, if any, will be spread on bacl<slopes and <br />the pit floor before topsoiling. There will 6e no toxic ma- <br />terials involved that could be leached. <br />l2) Grading will be done in a manner to prevent erosion and <br />siltation of ttie affected lands. The plan will protect areas. <br />outside the affected land from possible slides or other dam- <br />age. There will be no highwalls to be stabilised. <br />l3) 8ackfilling and grading will be accomplished as part of <br />the mining process. This definitely constitutes. a reasonable <br />timetable consistent with good mining and reclamation proce- <br />dures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.