Laserfiche WebLink
<br />2. Is the application complete? 4. <br />2a) Are all existing wells located in the affected ]ands, and in adjacent lands <br />where such structures may be affected by the proposed mining operation. <br />located on the required map (Exhibit "C")? 5A. <br />2b) Is the proposed sandstone quarry adequately described & depicted, vis a <br />vis, dimensions, on the amended application? 14A. <br />2c) Have the impacts of the increased scope of operations been studied in <br />sufficient detail? 29A. <br />2d) Does the application adeouately address the control of noxious weeds? 12. <br />3. Is the soils information adequate? 15A, 18A. <br />4. Have the potential off site impacts from blasting been adequately addressed? <br />1, 7A, 13A. <br />5. Have the potential impacts to permanent, man-made structures within 200 feet <br />of the affected land been adequately addressed? 12A. <br />6. Does the application accurately depict the ownership and location of adjacent <br />]ands? 22A. <br />7. Does the application adequately describe the significant wildlife resources, <br />including the threatened and endangered species, their use of affected lands, <br />and the general affect upon them during and after operations? 10, 13, 14. <br />8. Should a geotechnical stability analysis be required? 7A, 12A, 13A. <br />9. Is the reclamation plan adequate with respect to requirements of the Colorado <br />Land Reclamation Act For The Extraction Of Construction Materials Act ("The <br />Act") & the regulations thereto? 26A. <br />9a) Does the proposed reclamation of the highwall and benches meet the <br />requirements and performance standards of the act and regulations? <br />2, 17. <br />9b) Can a building remain on the property after reclamation? 16A. <br />10. General Issues <br />l0a) Are the affected lands within the boundaries of a state park (reference <br />34-32.5-115(4)(f)(N)? 9. <br />-5- <br />