My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52240
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:06 PM
Creation date
11/20/2007 3:16:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001035
IBM Index Class Name
Permit File
Doc Name
TROUT CREEK QUARRY BLASTING INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT CONSULTING EXPERIENCE Continued <br />D.H. Blattner .R Sans, C'obre Alining, Silver City, New n7exico (surface cppper} 1996. Audited the <br />blasting practices and prepared design change recummcndatinns that unproved blasting safety, pit slops <br />stsbility, and mine prpductivity. <br />Nashville Airport Quarry Fi11 Project -- Metric Construction Company, Nashville, Tennessee. <br />Responsible for Safety Training Program and Vibration~rlirbfast Control. Consultant to contractor, <br />approved by Nashville Airport Authority. PivC million cubic yards of rock was blasted m thts protect and It <br />included a tunnel for water and utilities. <br />Hanging Lake Tunnels Project -- 1989 to 1990. Blasting Consultant for Hanging lake Joint Venture, the <br />contractor; approved by Parsons, Brinckerhoff, Quads & Douglas Inc. end ColOrsdp DOT. peveloped <br />controlled hlm[ing ptnnn for surface brid"e~ abutment cuts, portal development cut. and multiple fn:.e <br />undergrpund tunnel rounds. Apprpved all 91aSting $uperviSpr yudlificatipns and loading procedures. <br />Barricl: p7eikle Mine, Carlin, Nevada • 1996. Audited the development heading blasting practices and <br />provided practical desiem improvements that increased round advance rates and reduced overbreak. <br />Precenreri rzrnmmendarinns rnneernino safe hlacring in hnr ~rnnnd and renrrnli~ed hlacring cyarernc. <br />Stillwater Mining Company, Nye, Montana - 1994 [0 1996. Aided the development and introduction of <br />nano+v vein long hole slope mining. Developed conrroflcd blasting [cchntques designed w mfn(mlze <br />dilution from a very weak hanemg Hall. Provjded practicai recommendations for controlling arnmonia and <br />nitrate Losses from evplosives. <br />AhIAX Coal, Gillette, Wyoming - 1989 to 1991. Provided a wide variety of blast design services that <br />improved overburden and coal bla.^,tino productivity. Developed special blast controls that minimised <br />ground vibration and air overpressure levels at Ileatby structures. <br />TRI-MET Light Rail Tunnel Project - Octpber 1993 to present. tllasting Consultant for hrontierlTreylor <br />joint venture. Prepared all blas[ittg plans and vibration.~noise mitigation and monitoring sysums for this <br />targ,P moot] and s6aA.'nlavtino ptt>ject in?r~rtland,'Jiegon. <br />Yucca Mountain Nuclear ~Yastc Repository Project - 199?. Provided controlled blasting designs and <br />infutmaliurt fur Rayllteur~ std Kicvvit-Parsons Drinkerhoff. This +vork was for the TBM stortar tunnel and <br />rite ongoing storage cavern excavations. <br />Hoover Dam Elevator Shaft Project -August 1994 [hrough April 1991. Blasting Consultant far Frontier <br />ICenlper Constrllc[ors, the contractor; approved by Bureau of Reclamation. Prepared a Blasting Program <br />designed to mrrl stringent vibntion and flyrock control requirements. Approved all hlacring strrervisnr <br />qualifications and Blast designs. <br />Roosevelt Urm 1'cetro fit -- 1991 to 9?. Developed controlled bias[ plans for 1.A. Junes, the uuntracwr, al <br />this U.S. Bureau of Reclamation project in Arizona. <br />Save[[ Oaks Diversion Tunnel -- June 199? to 93. Blasting Consultant For Tutor-Saliba and Dynatec <br />Mining; the contractors. Prepared the blast plans fur the diversion tunnel, valve chamber, and surface <br />cxuavaliuw nt rife pt ujet,t 'm Sii~hlands. California. <br />Hoover Dan1 Aeration Slots -- Frontier Kemper Constructors, Boulder Ciry, Nevada, 1986. Responsible <br />For Blasting Sefcty Progmm and Biast v ibration Control measures. Consultam to me contractor, approved <br />by U. S. Bureau of Reclamation. <br />Gortlen F. Revey -Qualifications Page 4 Phone: (303) 470-0418 Fdx: (303) 791-0160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.