..
<br />PROJECT CONSULTING EXPERIENCE Continued
<br />Southdown, Inc., Houston, Texas - 1998. Conducted Blast Desi,Gn and Risk Management Workshop for
<br />ytiarry managers at attltua( national meeting-Longmont, CO. Topics included principles of blast design,
<br />controlled blasting tecl,niyucs and measures for preventing blast vibration acrd air-overpn:ssure damage
<br />claims or litigatipn.
<br />Barrctts Minerals, Inc., Dillon, Montana - 1998. Pzrformed Blasting Practices Audit and recommended
<br />improvements designed to prevent losses of explosives to groundwater that mighs cause potential ammonia
<br />and nitrate pollution.
<br />INCO Lintitcd - "Smunth,s•all" Tunneling Project 1981. Conducted Blasting Method Rescarcl, at eight
<br />different mines to establish Smuothwall Tunneling standards for 1NC0 development and large chamber
<br />opening.
<br />M1linidoka Dam Replacement Powerplant & Switchyard Project -January 1996 to present. Providing
<br />blast design and 61ast affects control services to Superior Blasting. Inc. and Pirini Corporation, the blavting
<br />and prime contractors, ruspcc[ively, at this very challenging U.S. Bureau of Reclamation project in Idaho.
<br />B. Eng., Mining Engineering, 1980, Laurentian Untvcrsity, Sudbury, Ontario, Canada
<br />PUBLICATIONS TRAINING AND PRESENT.4TION5
<br />Biannually Conduct ROCK BLASTING TECHNOLOGY AND RISK MANAGEMENT COURSE.
<br />71tis tvvo-day program, sponsored by ASCE, is designed specifically for project managers, engineers,
<br />attorneys and government agency professitmn',;. The course covers explosives end initiation system
<br />technology, principles of controlled blast design, identitication of blasting risk and management strategies,
<br />speciticetion dcvcloplnent, and cost estimatittp. ,
<br />Published "Underground Bull: lvtining Blast Design and r'ibration Monitoring at INCO Metal's
<br />Sudbury Operations." Printed, August 30, 1991. I'roparcd for Canada Ccn[cr for Mineral Energy and
<br />Technology.
<br />Presented "Blasting a Tunnel Through Folsom Dam " a paper describing controlled blastinE, planning,
<br />and testing methods used to successfully blot an air-imake tunnel through [he Folsom Dam. Despite
<br />blasting under the pressure of a very tight sche. etuie and near many critical cir„crnrns--inclnAine mdin) pyres,
<br />trunnion snchors, a roadway, geed a concrete spra}n+all, all blasting occurred without damage.
<br />EdltOr and COOVlbadng author to "Explosives and Rocl: f31as1ing;' a wmprchcnsivo La~1 <uvLi
<br />blasting handbook published by .Atlas Po,vder Company in 1987.
<br />Presented paper titled, "Controlled Blasting et the Hanging Lake Tunnels Project" at the annual
<br />Socizt}' of Explosives Engineers mcaing in Los Vegos, Nl+, ]anuary', 1991.
<br />Presented "Controlled Excevetiolt at the Trana-koolau Halawa Tunnels" paper at the Society of
<br />F..xplnsivcs Engineers annual meeting in San DieEo, California, January, 1993.
<br />Gortlon F. Revey -Qualifications Page 6 Phone: (303) 470-0418 Fax: (303) 791-0140
<br />
|