Laserfiche WebLink
C) Please refer to questions under EXHIBTI' "D" (I) for salvaging and protecting top soil. <br />III) EXHIBIT "L" RECLAMATION COST 6.4.12 <br />A) Under this exhibit, the operator states, "No reclamation costs aze proposed for this operation, <br />since the only reclamation outside of the stream bed would be to slope the gully walls at 3H:1 V. <br />The Division has enclosed the financial warranty calculation with the adequacy letter. The <br />calculation includes the cost of cutting the embankment slopes to 3H:1 V. It also includes the re- <br />vegetation cost for the embankments in accordance with the local SCS recommendations <br />provided with the application. <br />However, since the permit area includes pazcels outside of the arroyo, the Division will place a <br />condition that if any area is affected out side of the arroyo, the operator will have to submit an <br />amended mining plan, and the appropriate financial warranty, to cover the cost of reclamation. <br />If you have additional questions or concern, please contact me at (303) 866-4072 <br />Sincerely, <br />Berhan~ele~ ~ ~.7j <br />Reclamation Specialist <br />CC: James Stevens <br />