Laserfiche WebLink
PART I Page 11 of 20 <br />Permit No. COR-040000 <br />D. BASIC TERMS AND CONDITION -ALL FACILITIES (contJ <br />otherwise provided by the Division, the permittee shall have 30 days after such notification to both make the <br />necessary changes to the plan and to implement them. <br />The permittce shall amend the plan whenever there is a change in design, construction, operation, or <br />maintenance which has a significant effect on the potential for the dischazge of pollutants [o the waters of the <br />State, or if the SWMP proves to be ineffective in achieving the general objectives of controlling pollutants in <br />stormwater discharges associated with mining activity. Amendments to the plan shall be su~+*~~~~Pd in the <br />Annual or Compliance Report. <br />3. Prohibition of Non-stormwater Discharees <br />a. Except as provided in paragraph b, below, all discharges authorized by this permit shall be composed <br />entirely of stormwater. Dischazges of water other than stormwater must be addressed in a separate CDPS <br />permit issued for that dischazge. <br />b. Dischazges from the following sources that are combined with srormwater dischazges associated with mining <br />activity may be authorized by this permit, provided that the non-stormwater component of the dischazge is <br />identified in the SWMP (see Part I.B.4.g of the permit): fire fighting activities, uncontaminated compressor <br />condensate, irrigation drainage, lawn watering, air conditioner condensate, uncontaminated seeps and springs, <br />and foundation or fooling drains where flows aze not contaminated. <br />Releases in Excess of Reportable Quantities <br />This permit does not relieve the permittee df the reporting requirements of 40 CFR 110, 40 CFR 117 or 40 CFR <br />302. Any dischazge of hazazdous material must be handled in accordance with the Division's Notification <br />Requirements (see Part II.A.3 of the permit). <br />Faciliri Inspections <br />a. Active Mining Operations. Qualified personnel identified by the operator shall make a [borough inspection of <br />their stormwater management system, at least twice per yeaz (in the spring and fall). Where semi-annual site <br />inspections are shown in the plan to be impracticable because an employee is not stationed or does not routinely <br />visit the site, inspections as required in this pan shall be conducted at appropriate intervals specified in the plan, <br />but never less than once in two years. These inspections must be documented and sumrt!a*+~r~l in the Annual <br />Report (see Pan I.E.1 of the permit). <br />b. Inactive Mining Operations. Qualified personnel identified by the operator shall make a thorough inspection <br />of their stormwazer management system, at least once per year. Where annual inspections are shown in the <br />plan to be impracticable, because an employee is not stationed at or does not routinely visit the site, an <br />inspection and certification is required once every three years by a Registered Professional Engineer that the site <br />is in compliance with the plan. These inspections must be documented and s~~.nrna,;~r11 in the Compliance <br />Report (see Part I.E.1 of the permit). <br />c. Remediation Operations. Qualified personnel identified by the operator shall make a thorough inspection of <br />their stotmwater management system, a[ least once per yeaz (in the field season). Where annual site inspections <br />are shown in the plan to be impracticable, because an employee is not stationed at or does not routinely visit the <br />site, inspections as required in this part shall be conducted at appropriate in[ervals specified in the plan, but <br />never less than once in two years. These inspections must be documented and summarized in the Annual <br />Report (see Pan I.E.1 of the permit). <br />d. Inspection Requirements -ALL Operations. The inspections as required above must include the following: <br />1) Disturbed azeas and areas used for material storage that are exposed to precipitation shall be inspected for <br />evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control <br />