Laserfiche WebLink
PART I Page 10 of 20 <br />Permit No. COR-040000 <br />C. STORMWATER MANAGEMENT PLAN - fNACTIVE MINES (cont.) <br />mine waste, method and type of revegetation, and other permanent BMPs. The plan shall also include a <br />description of the ultimate ]and use afrer remediation is complete. <br />6. Cogsistencv with Other Plans <br />SWMPs may reflect requirements for Spill Prevention Control and Countermeasure (SPCC) plans under section 311 <br />of the CWA, or Best Management Ptactires (BMPs) Programs otherwise required by a CDPS permit, and may <br />incorporate any part of such places into th.e SWMP by reference. The SWMP may reflect information contained in <br />approved plans submitted for other simil:u pollution control programs, including the Voluntary Clean Up Program. <br />(Voluntary Cleanup and Redevelopment .Act, CRS 25-16-303) as long as they contain the elements described above. <br />These plans must have been approved by the implementing agency prior to application for the Stormwater Permit. <br />Appropriate ponions of these other plans may be incorporated in the SWMP by reference, as long as a complete <br />SWMP can be reproduced and submitted to the requesting agency within the time frame specified in the request. <br />Those portions of the referenced documents must be included in the submittal. The SWMP mus[ also be readily <br />available to an on-site inspector. <br />D. BASIC TERMS AND CONDITIONS -ALL FACII,ITIES <br />General Limitations <br />The following limitations shall apply to all discharges authorized by this permit: <br />a. Stormwater discharges from mining operations or mine-waste remediazion projects shall not cause or threaten to <br />cattle pollution, contamination or de:gradarion of Staze wazers. <br />b. Bulk storage structures for petroletun products and other chemicals shall have adequate protection so as to <br />contain all spills and prevent any spilled material from entering Staze waters. <br />c. No chemicals are to be added to the discharge unless permission for the tue of a specific chemical is gran[ed by <br />the Division. In granting the ttse of such chemicals, special wnditions and monitoring may be addressed by <br />separaze letter. <br />d. All dischargers must comply with the lawful requirements of counties, drainage districts and other state or local <br />agencies regarding any discharges of stormwarer to storm drain systems or other water courses under their <br />jurisdiction. <br />SWMP Requirements <br />The following conditions must be met to achieve compliance with this permit: <br />a. SWMP Preparation and Implementation: The SWMP shall be prepazed prior to applying for coverage under <br />dte general permit, and certification of completion submitted with the application. The SWMP shall be <br />implemented when the facility begins operation, or when the general permit certification is issued, whichever is <br />later, and updated as appropriate. <br />b. SWMP Retention: For alive mining operations, the plan shall be signed in accordance with Part I.E.2, and <br />retained on si[e. For inactive mining operations, the plan shall be signed in accordance with Pan I.E.2, and <br />retained by the permittce. <br />c. SWMP Submittal/Review/Changes: The Division reserves the tight to request and review the plans, and to <br />require additional measures to preven[ and control pollution, as needed. Upon review of the SWMP, the <br />Division rosy notify the permittce at any time that the plan does not meet one or more of the minimum <br />requirements of this permit. After such notification, the permittce shall make changes [o the plan. Unless <br />