Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd sheet 2 of 2 <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />R oaduay underfootin9 conditions: <br />Haul :Rutted dirt, little/no maint., 1-2" fire pen. <br />Return: Rutted dirt, little/no maint., 1-2" Cire pen. <br />Haul & Return Time grade rolling total travel <br />------------------ length res. res. res, time <br /> (ft) (%) ('G) (X) (min) <br />Haul route 150 8.00 5.00 13.00 0.286 (CAT HB) <br />Return route: 150 -8.00 5.00 -3.00 0.148 (CAT HB) <br /> Total travel time 0.434 <br /> Total cycle time 0.999 minutes <br />Loader Bucket Capacit y <br />Rated Capacity 4.50 LCY (heaped) (CAT HB) <br />Bucket fill factor 0.900 Other - soil, boulders, roots (80 -100L) <br />Adjusted capacity 4.05 LCY <br />Job Condition Correction Factors <br />Site altitude 9,400 feet <br />Altitude correction factor 0.93 (LAT HB) <br />Job efficiency factor 0.83 (1sh/day) <br />Net correction 0.77 multiplier <br />Unadjusted hourly unit production 243.21 LCY/Hr <br />Adjusted hourly unit production 187.73 LCY/Hr (CAT HB) <br />Adjusted hourly fleet production 187.73 LCY/Hr <br />JOB COST <br />Fleet size 1 Loader(s) Total job time 8.52 Hours <br />Unit cost E0. 389 /LCY Total job cost 8623-17 <br />