My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51884
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:51 PM
Creation date
11/20/2007 3:06:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999058
IBM Index Class Name
Permit File
Doc Date
8/16/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I R C E S Cost Estimating Sof[ua re ' <br /> EARTHNORK FORM - EXCAVATOR YORK <br />____________________________________ <br />____________________________________ <br />Agency or organixati on name DMG <br />Task # 052 State Colorado Permit # :M-99-058 <br />Date 07/27/99 County Gunnison Abbr. :none <br />User RCO Site Yule Quarry Filename M058-052 <br />Permit/job action Reclamation <br />______________________________________ <br />Task description Clean out sediment pond <br />HOURLY EOUI PMENT COST <br />_____________________ Basic machine Cat 311 (1996) <br />Cost Breakdown -------------------- <br />------------- Utilization % <br />Ownership S/hour 415.06 NA <br />Operating E/hour 413.36 100 <br />Operator E/hour E23.13 NA <br />Total unit E/hour: E57.55 Total fleet E/hour: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume 200 LCY factor NA volume <br />Source of quantity take-off AppLicati on, maps <br />Source of est. swell factor NA <br />Shift basis: 1/day <br />Horsepower 79 <br />Weight (MT ): 11.01 <br />(LRG) <br />E51.55 <br />200 LCY <br />HOURLY PRODUCTION <br />_________________ <br />_________________ <br />Cycle Time Basic job condition description BELON AVERAGE <br />---------- Time value within job condition AVERAGE <br />Basic cycle time 0.32 min. <br />Bucket Capacity ------------- <br />--------------- <br />Rated capacity 0.29 LCY (heaped) Size class small <br />Bucket fill factor 0.68 Blasted rock - poorly blasted (60 - 75X) <br />Adjusted capacity 0.20 LCY <br />Job Condition Correction Factors Altitude adj. 0.85 (CAT HB) <br />________________________________ Job eff. adJ• 0.83 (1 s/d) <br />Site altitude 9,400 fee[ ------------- <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB LOST <br />Net correction 0.71 <br />37.17 LCY/Hr <br />26.22 LLY/Hr <br />26.22 LCY/Nr <br />Fleet size 1 Excavator(s) Total job time: 7.63 Hours <br />____--_-- ------------- <br />Unit cost E1.966 /LCY Total job cost: 4393 <br />
The URL can be used to link to this page
Your browser does not support the video tag.