Laserfiche WebLink
~1 R C E S Cost Estimating Software • sheet 1 of 2 <br />EARTHWORK FORM - WHEEL LOADER WORK <br />____________________________________ <br />____________________________________ <br />Agency or organization name DMG <br />Task # 051 State Colorado Permit # M-99-058 <br />Date 07/26/99 County Gunnison Abbr. none <br />User RCO Site Yule Oua rry Filename M058-051 <br />Permit/job action Reclamation <br />Task description Close portals <br />HOURLY EOUI PMENT COST <br />__________________ __ Basic machine :CAT 966E (93 )Horsepower 220 <br />Attachment #1 :ROPS Cab Shift basis: 1/day <br />(CRG) <br />Cost Breakdown Ownership E/hour E24.36 <br />-------------- Operating S/hour E25.65 100 X utilization <br />Operator E/hour E23.12 <br />Total unit E/hour: E73.12 Total fleet cost/hr E73. 72 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume 1,600 LCY factor NA voL une 7,600 LCY <br />Quantity source/reference Reclamation plan, map <br />X Swell source/reference NA <br />HOURLY PRODUCTION <br />_____________________ <br />_____________________ <br />Loader Cycle Time <br />----------------- <br />Unadjusted basic cycle time (load, dump 8 maneuver) <br />Cycle Time Factors <br />Type of material Material 3/4" to 6" diameter <br />Type of stockpile : No adjustment - factor not applicable <br />Truck ownership No adjustment - factor not applicable <br />Type of operation No adjustment - factor not applicable <br />Type of dump target: Small target <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />0,525 min. <br />(CAT HB) <br />Factor (min.) <br />0.000 (CAT HB) <br />0.000 (CAT HB) <br />0.000 (CAT HB) <br />0.000 (CAT NB) <br />0.040 (CAT HB) <br />0.040 min <br />0.565 min. <br />