My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Soutb Pit Drill Pad Area I <br />18• Rough grade area with a Cat D9. ($164.27 x 10 hrs) $ 1,643 <br />19 Haul 5,647 cyd of topsoil from topsoil stockpile #2. Using Cat <br /> 980 loader and truck team. $ 6,590 <br />20 Finish grade area with Cat 14G Motor Grader. (3.5 acres) $ 301 <br />21 • Seed, mulch, fertilize (3.5 acres (a) 5800/acre) $ 2,800 <br /> Total $ 11,334 <br /> DMG Costs (19S% x Direct Costs) $ 2,210 <br /> Total Bond Amount $ 13,544 <br />~ Reconstruction of Carbon Junction Canvon ~ <br />Regrade 1040' of upper channel with Cat D9. ($164.27 x t6 <br />hr;) $ 2,628 <br />Excavate channel using Cat 330 hydraulic excavator. Hard <br />digging section. (3,992 cyd) $ 11,666 <br />Excavate channel using Cffi 330 hydraulic excavffior. Easy <br />digging section. (3,992 cyd) $ 2,010 <br />Purchase 584 cyd filter material @ $20.25, 864 cyd of D 1.0 rip <br />rap @ $23.25, SS9 cyd of D1.5 rip-rap @ $23.35, 1,977 cyd of <br />D L75 Rip-Rap @ $28.25, and 491 cyd of D2.5 RipRap @ <br />~ <br />$35.25. $ 125,732 <br />'i <br />Place titter mffieriffi using Cffi 330 hydraulic excavator and skid <br />steer loader. (Cat 330 @ 105.28 and Cat Skid-steer @ 37.27 <br />for 24 hrs) $ 1,000 <br />Place filter material using Cffi 330 hydraulic excavffior.. (Cat <br />330 @ 105.28 for 173 hrs) $ 18,213 <br />Purchase 9'4" Arch Culvert 85' Long. $ 9,903 <br />Install Arch Culvert and Rip-rap Splash wall a[ outlet. $ 7,000 <br />Surveying Costs $ 4,500 <br />Haul 3,000 cyd of topsoil from Stockpile #2. Using Cat 980 <br />Loader and truck team. $ 2,206 <br />DMG Costs (19.5% x Direct Costs) $ 36,270 <br />Total Bond Amount $ 222,272 <br />Reclamation of Sediment Pond # 2 <br />Task Descripfion Cost <br />31 * Estimate from Mike Savage (Little Earthwork no recoiling, <br />reve ion included) S 2,881 <br />Total $ 2,881 <br />DMG Costs (19S% z Direct Costs) $ 562 <br />Total Bond Amount $ 3,443 <br />• Estimate agreed upon by all parties present <br />•* Costs based on current local prices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.