My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Pit <br />1 Bring spoil up from the slope to the bench. Use Cai 330 <br /> Hydraulic Excavator. (1,000 cyd) $ 678 <br />2 Move recovered spoil ad site cut into base of scarp. (11,220 <br /> cyd) $ 10,544 <br />3' Move all boulders and cobble material into inside tce. Use Cat <br /> D9 ($164.27/hr x 26 hrs) $ 4,271 <br />4 Use Cat 9801oader and track team to haul fill from lower fill <br /> storage to bench. (24,008 cyd) $ 37,326 <br />5 Regrade fill to final contour using Cm D9. Uphill push of 245 <br /> for 120') $ 21,397 <br />6 Use Cat 9801oader and truck team [o haul topsoil from <br /> Stockpile #2 to bench. (38,000 cyd) $ 52,217 <br />7 Final grading and spreading of topsoil. Use Cat D9 on uphill <br /> push of 28% for 100'. (38,000 cyd) No discing or harrowing <br /> needed. $ 72,174 <br />8' Seed, mulch, fertilize (8.35 acres ~ $800/acre) $ 6,680 <br />9• Construct 3 settling ponds. ($2,500/pond) $ 7,500 <br />0 Compact topsoil an slope. $ 7,877 <br />11 Install ditch above it with limn S <br /> Total $ 22Q,664 <br /> DMG Costs (198% a Direct Costs) $ 43,029 <br /> Total Bond Amount $ 263,693 <br />Haul Road, Topsoil Stockpile #2, and Excess Fill Pile <br />12A Hau1679 cyd of fill from lower area to the haul road area <br /> Using Cat 980 loader and truck team. $ 883 <br />12B Hau1679 cyd of fill from lower area to the haul road area <br /> Using Cat 980 loader and truck team. $ 4,886 <br />13• Grade topsoil and fill to final contour using Cat 14G. (14 hrs <br /> @$100/Iv) S 1,400 <br />14 <br /> Hau13,000 cyd of topsoil from Stockpile #2 to excess fill pile <br /> prior to seeding. Using Cat 980 Loader and ttuck team. $ 3,262 <br />15 Regrade the fill pile to final contour after excavation using a <br /> Cat 14G Motor Grader. (4.25 acres) $ 347 <br />16 Regmde topsoil stockpile using Cat 14G Motor Grades (2.69 <br /> acres) $ 231 <br />1 T Seed, mulch, fertilize (9.25 acres a 5800/acre) S 7,400 <br />' Total $ 18,409 <br /> DMG Costs (19.5% x DireM Costs) $ 3,590 <br /> Total Bond Amount $ 21,999 <br />• Estimate agreed upon by all Darties Dresent <br />
The URL can be used to link to this page
Your browser does not support the video tag.