My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation of South Pit <br />32 Hau167,000 cyd from fill pile to south pit using Cat 980 <br /> Loader and track team. $ 79,978 <br />33 Push 41,875 cyd loose fill up az 28% for 70' using a D9. $ 20,731 <br />34 Compact back fill. $ 7,877 <br />35 Push 10,000 cyd topsoil from Stockpile # 3 downhill az 28% <br /> for 450' using a D9. $ 11,202 <br />36• Seed, mulch, fertilize (7.7 acres n $800/acre S 6,160 <br /> Total $ 125,948 <br /> DMG Costs (19.5% x Direct Costs) $ 24,560 <br /> Total Bond Amount $ 750,508 <br />~ Items Absorbed by Gravel Pit ~ <br /> Backfill sediment pond # I using Stockpile # 8 and some of <br /> Stockpile #4 with a D9. (39930 cyd, downhill at 155 for 200') $ 26,815 <br />38 <br /> Haul remaining topsoil in stockpile #4 and #7 into gravel pit <br /> area Using 2 Cat 980 Loaders and truck teams on 188,966 cyd <br /> along a 1200' route with and average grade of 9%.. $ 186,900 <br />39• Disc stockpile areas. (12.86 acres (a~ $64.47/acre) $ 829 <br />40• Reclaim Old Carbon Jct Diversion Channel with D9. ($164.27 <br /> x 35 hrs) $ 5,749 <br />4I• Seed, mulch, fertilize 16.64 acres n 5800/acre) S 13,312 <br /> Total S 233,605 <br /> DMG Costs (19S% z Direct Costs) $ 45,553 <br /> Total Bond Amouut $ 279,158 <br />~ Mobilization/Demobilization Costs ~ <br />42 Mob/Demob 4776 <br />Total $ 4,776 <br />DMG Costs (19.5% x Direct Costs) $ 931 <br />Total Bond Amount $ 5,707 <br />Complete Bond <br />Total $ 960,325 <br />' Estimate agreed upon by all parties present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.