My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : L And Assc <br />Task # : t19 State :Colorado Permit/job # :080 <br />Date : 11/152003 Courdy : La Plata Abbreviation :none <br />User : BHM Site :Oakddge Energy Filename :0080-h9 <br />PermB or otherjob argon :Final Rec <br />Task description : T8sk 29 <br />HOURLY EQUIPMENT COST <br />sheet 1 of 2 <br />Shift basis : 1 perday <br />Tfucklloader team -Truck :Generic f2-18 cy, 6x4 <br />-Loader :CAT 980E std. liR (1995) <br />Support equipment -Load area <br />Road maintenance -Motor grader :CAT 14H <br />-W ater truck :Water Tanker 3.500 Gal. <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Mainenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA grader misctruk <br />Utitizafion-machine : 94 100 NA NA 35 35 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour: $20.12 $27. B5 NA NA $36.44 $11.09 <br />Operating cosUhour: $25.21 $43.30 NA NA $15.45 $5.78 <br />Ripper op. costlhour : NA NA NA NA $0.00 NA <br />Operator costlhour : $23.61 $27.99 NA NA $28.18 $23.61 <br />Unk subtotals : $68.94 $99.13 NA NA $80.07 $40.47 <br />Number of units : 2 1 0 0 1 1 <br />Group subtotals : Work : $237.01 Support : $0.00 Maintenance : $120.54 <br />MATERWL QUANTITIES <br />Initial <br />volume : 2,307 BCY <br />Total work team cosUhour : $357.55 <br />Swell Loose <br />factor: 1.250 volume: 2,884 LCY <br />Source of quantity takeroff :ACAD <br />Source of estimated swell factor :ACAD <br />Matedal purchase cost : $D.00 /LCY <br />., . . ,. , <br />HOURLY PRODUCTION - T r ~ -~- ~ ~-~~~ ~ - <br />Truek Capacity <br />Total cost : $0 <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,550 poundslLCY Struck volume : 12.00 LCY <br />Descr.: Earth -dry packed Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacty : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 15.98 LCY <br />Loading Tool Caoacfir : Job Condition Corrections : Sde att@ude (ft.) : 7,000 <br />Rated capacity (nom. heaped) : 5.750 LCY Truck Loader Source <br />Desa.: Loose material - fA3'to 3r8" (90 - 95%) Attitude adj.: 1.000 1.000 (Caf HB) <br />Bucket fill factor : 0.925 Job efficiency : 0.830 0.830 (1 shiR/day) <br />Adjusted bucket capacity : 5.319 LCY Net conecfion : 0.830 0.830 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.