My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORt( <br />Task # : e>~ <br />Date : 11252003 <br />User : BHM <br />State :Colorado <br />County : La Plata <br />Site :Oakridge Energy <br />Agency or organization name : L And Assc. <br />Permit or other job action :Final Rec <br />Task description :Task 23B (E <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : Utilization <br />Ownershipcost/hour : $41.55 NA <br />Operating cosUhour : $35.55 80 <br />Operator wsUhour : $28.18 NA <br />Total unit cosVhour <br />,, : $105,28 <br />~ <br /> <br />MATERIAL QUANTITIES r. _ <br />Initial Swell <br />volume : 3,992 BCY factor : 1.250 <br />Source of estimated volume :ACRD <br />Source of estimated swell factor : ACAD <br />.. <br />HOURLY PRODUCTION <br />6ccavator Cvc1e Time (loadbucket, swing loaded,-du~cket. swing emot <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.42 minutes <br />Bucket Caoacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 2.19 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 ~ (Cat HB) <br /> Job et7ciency adjustment : 0.83 (1 shiff/dayJ <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 314.89 LCY/hour <br />Adjusted hourly unit production : 261.36 LCYlhour <br />Adjusted hourly fleet production : 261.36 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 19.09 hours <br />Unit cost : $0.403 per LCY Total job cost : $2,010 <br /> <br />Machine description :Cat 3308 L <br />Horsepower: 222 <br />Weight (MT) : 33.73 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />Total fleet cosUhour : $105.28 <br />Loose <br />volume : 4,990 LCY <br />Permiffjob # :080 <br />Abbreviation :none <br />Filename :0080-ex3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.