Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORt( <br />Task # : e>~ <br />Date : 11252003 <br />User : BHM <br />State :Colorado <br />County : La Plata <br />Site :Oakridge Energy <br />Agency or organization name : L And Assc. <br />Permit or other job action :Final Rec <br />Task description :Task 23B (E <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : Utilization <br />Ownershipcost/hour : $41.55 NA <br />Operating cosUhour : $35.55 80 <br />Operator wsUhour : $28.18 NA <br />Total unit cosVhour <br />,, : $105,28 <br />~ <br /> <br />MATERIAL QUANTITIES r. _ <br />Initial Swell <br />volume : 3,992 BCY factor : 1.250 <br />Source of estimated volume :ACRD <br />Source of estimated swell factor : ACAD <br />.. <br />HOURLY PRODUCTION <br />6ccavator Cvc1e Time (loadbucket, swing loaded,-du~cket. swing emot <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.42 minutes <br />Bucket Caoacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity : 2.19 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,000 feet Altitude adjustment : 1.00 ~ (Cat HB) <br /> Job et7ciency adjustment : 0.83 (1 shiff/dayJ <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 314.89 LCY/hour <br />Adjusted hourly unit production : 261.36 LCYlhour <br />Adjusted hourly fleet production : 261.36 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 19.09 hours <br />Unit cost : $0.403 per LCY Total job cost : $2,010 <br /> <br />Machine description :Cat 3308 L <br />Horsepower: 222 <br />Weight (MT) : 33.73 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />Total fleet cosUhour : $105.28 <br />Loose <br />volume : 4,990 LCY <br />Permiffjob # :080 <br />Abbreviation :none <br />Filename :0080-ex3 <br />