Laserfiche WebLink
TrucklLoader Team Work cont'd Task # : tr9 sheet 2 of 2 <br />Loading Tool Cvele Time : Number of loading tool passes required to fill truck : 3 passes <br />F,rcavators and troll shovels -machine cycle time vs. job condition rating : NA <br />-selected value vrithin basic rating : NA <br />Track loaders - material descr.: NA <br />-cycle time elemems (min.) : Load <br />NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Matedal : No adjustment -factor not applicable 0.000 (Cat HB) <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat HB) <br />Tmck ownership : No adjustment -factor not applicable 0.000 (Cat HBJ <br />Operation: Noadjusfinent-factornotapplicable 0.000 (CatHB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : 0.000 minutes <br /> Adjusted basic cycle time : 0,550 minutes <br />Net load time per truck (bulk of first loader pass completed during Wck exchange) : 1.200 minutes <br />Truck Cvele Time <br />Truck exchange Time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.200 minutes........ Adjusted for she alfttude : 1.20 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.90 minutes <br />Truck travel (haul & return) time: <br />Road condition description :Rutted did, I'tde maintenance, no water, 2"tire penetietion <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />feeUminute Travel time' <br />(minutes) <br />> 300 0.00 5.00 5.00 1695 0.35 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />1 300 <br />• first arM last sagmeMS atlJustetl ror eccalerntl°NdecelareHOn <br />fime shown iulutlm alrlWtla etljustmeM <br />Haul time •' : 0.35 <br />5.00 5.00 3200 0.26 <br />Return time " : 0.20 <br />Total Muck cycle time : 3.21 <br />minutes <br />minutes <br />minutes <br />Loading tool unit production : 563.16 LCY/hour...... Adjusted forjob efficiency : 467.42 LCYRtour <br />Truck unit production : 298.50 LCY/hour...... Adjusted forjob efficiency : 247.75 LCY/hour <br />Optimal no. truckslloading tool : 2 trucks........... Selected no. truckslloader : 2 trucks <br /> Adjusted houry truck team production : 495.51 LCYRrr <br /> Adjusted houry single trucklloader team production : 487.42 LCYRtr <br /> Adjusted hourly multiple Wcklloader team production : 467.42 LCYRv <br />' <br />JOB TIME AND COST - <br />Fleet size : 1 Team(s) Total job tlme : 6.17 Hours <br />Unit cost : $0.785 /LCY Total job cost : $2,206 <br /> <br />