My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />Task # : cp1 State :Colorado Perrnitfjob # :080 <br />Date : 21-Nov-2003 County : La Plata Abbreviation :none <br />User : BHM Site : Oakddge Energy Filename :0080-cp1 <br />Agency or organization name : L And Assc. <br />Permit or other job action : Final Rec <br />Task description :Task 10 <br />. .. ,: <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 815F <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Loose <br />Compactor type :Reclamation <br />Horsepower: 220 <br />Shift basis : 1 per day <br /> Utilization % Data source : (CRG) <br />Ownership cost hour : $48.44 NA <br />Operating cost/hour : $34.96 80 <br />Operator cosUhour : $27.55 NA <br />Total unit cosUhour : $110.95 Total fleet cosUhour : $110.95 <br /> <br />volume : 46,250 LCY <br />Shrinkage <br />factor : 0.800 <br />Source of estimated volume :ACRD <br />Source of estimated shrinkage factor : ACAD <br />HOURLY PRODUCTION <br />Unadjusied hourly production = (W x S x L x C1/ P <br />Compacted <br />volume : 37,000 CCY <br />Compacted width per pass (VV) : 6.42 feet <br />Average compactor speed (S) : 2.50 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 fl./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 5 passes <br />Unadjusted hourly unit production : 827.88 CCYlhr <br />Job Condition Correction Factors <br />Site altitude : 7,000 feet <br />Source <br />Altitude adjustment factor : 1.00 (Caf HB) <br />Job efficiency factor : 0.83 (1 shift/dayJ <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production : 521.14 CCY/hr <br />Adjusted hourly fleet production : 521.14 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 71.00 hours <br />Unit cost : $0.213 per CCY Total job cost : ~ $7,877 <br />
The URL can be used to link to this page
Your browser does not support the video tag.