Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task#: dZ3 <br />Date : 11212003 <br />User : BHM <br />State :Colorado <br />County : La Plata <br />Site :Oakridge Energy <br />Agancy or organization name : L And Assc. <br />Permit or otherjob action :Final Rec <br />Task description :Task 7 <br />. - .... <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 38,000 <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : i-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Ownership cost/hour : $54.81 NA <br />Operating cost/hour : $76.74 80 <br />Ripper op. cosUhour : $1.18 10 <br />Operator cosUhour: $27.99 NA <br />Total unit cosUhour : $160.72 Total fleet cosUhour : $160.72 <br /> <br />Swell Loose <br />BCY factor : 1.250 volume : 47,500 LCY <br />Source of estimated volume :ACRD <br />Source of esiimated swell factor :ACRD <br />HOURLY PRODUCTION <br />Average push distance : 140 feet <br />Unadjusted hourly production : 968.5 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 30.00 % ({ <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency:_ <br />Dozing method :_ <br />Visibility <br />Job efficiency :_ <br />Spoil pile :_ <br />Push gradient :_ <br />Altitude :_ <br />Material weight <br />Blade type <br />Net correction <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />Q1.519 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />PermiUjob# :080 <br />Abbreviation :none <br />Filename :0080-dz3 <br />0.68 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.30 <br />1.00 <br />0.90 <br />1.00 <br />0.11 <br />SOUfCe <br />105.77 LCY/hr <br />105.77 LCY/hr <br />Total job time : 449.07 Hours <br />Total job cost : $72,174 <br />