Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : tr2 sheet 2 of 2 <br />Loading Tool Cvcle Time : Number of loading tool passes required to fill track : 3 passes <br />F~rcavators and front shovels -machine cycle time vs, job condition reting : NA <br />-selected value vritliin basic rating : NA <br />Track loaders - material descr.: NA <br />-cycle time elemerds (min.) : Load : NA Maneuver : NA Dump : 0.10D <br />Wheel and track loaders -unadjusted basic Cyde time (load, maneuver, and dump) : 0.550 minutes <br />Cyde Time Factors Loading Condition Description Factor (min.) Source <br />Material: Noadjustment-factornotapplicab/e 0.000 (CatHB) <br />Stockpile: Noadjusfinent-fadornotapplicab/e 0.000 (CatHB) <br />Truck ownership : No adjusfinent -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustmem : 0.000 minutes <br /> Adjusted basic Cyde time : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed during Wck exchange) : 1.200 minutes <br />Truck Cvcle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site afiitude : 0.50 minutes <br />Truck load lime: 1.200 minutes........ Adjusted for sRe altitude : 1.20 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for ske altitude : 0.90 minutes <br />Truck travel (haul & return) time: <br />Road condition description : Sott, rutted dirt, no maintenance or water, 4° fire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (Wo) Speed <br />feet/minute Travel time' <br />(minutes) <br />1 540 3.30 5.00 8.30 1177 0.52 <br />2 1,490 11.50 3.00 14.50 616 2.34 <br />3 550 0.00 8.00 8.00 1177 0.53 <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time " : 3.39 <br />1 550 0.00 8.00 8.00 2274 0.33 <br />2 1,440 -11.50 3.00 -8.50 3520 0.41 <br />3 540 -3.30 5.00 1.70 3360 0.26 <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />'first and last segments atljustetl f°rawelealioNtlacelara6on Return time"' 1.00 minutes <br />tune atwwn mcwdas amtuae eaustmetrt Total truck Cyde time : 8.98 minutes <br />Loading tool unk production : 563.16 LCYPoouc..... Adjusted for job efficiency : 467.42 LCYlhour <br />Truck unit production : 137.09 LCYRtour...... Adjusted forjob effidency : ! 13.79 LCYRtour <br />Optimal no. Wckslloading tool : 4 trucks........... Selected no. truckslloader : 4 trucks <br /> Adjusted hourly truck team production : 455.15 LCYRtr <br /> Adjusted hourly single truckAoader team production : 455.15 LCY/ttr <br /> Adjusted houry multiple trucklloader team production : 455.15 LCY/ltr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 104.38 Hours <br />Unftcost: $1,099 -fLCY Total job cost: ~r'$52;217- <br />n. <br />