Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency w organization name : L And Assc. <br />Task # : tr4 State :Colorado PermfUjob # :080 <br />Date : 11!252003 County : La Plata Abbreviation :none <br />User : BHM Site :Oakridge Energy Filename :0080.h4 <br />Permit or other job action :Final Rec <br />Task description :Task 1T <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 3,500 Gal. <br />Cost Breakdown : rucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : huck2 loader NA NA grader mischuk <br />°k Utilization-machine : 100 72 NA NA 35 35 <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosUhour : $20.12 $27.85 NA NA $36.44 $11.09 <br />OperatingcosUhour: $26.72 $31.02 NA NA $15.45 $5.78 <br />Ripper op. cosf/hour : NA NA NA NA $0.00 NA <br />Operator cosUhour : $23.61 $27.99 NA NA $28.18 $23.61 <br />Unit subtotals : $70.45 $86.86 NA NA $80.07 $40.47 <br />Number of units : 2 1 0~ 0 1 1 <br />Group subtotals : Work : $227.76 Support : $0.00 Mairtenance : $120.54 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 679 8CY <br />Total work team cosUhour : $348.31 <br />Swell <br />factor : 1.250 <br />loose <br />volume : 849 LCY <br />Source of quantity take-off :ACAD <br />Sowce of estimated sweW factor :ACAD <br />Matertel purchase cost : $0.00 1LCY <br />7nrck Caoacily <br />Basis <br />Material weight : 2,550 poundslLGY Struck volume : 12.00 LCY <br />Desa.: Earth -dry packed Heaped volume : f 8.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 18.82 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 15.98 LCY <br />Loading Tool CaoaciN : Job Condition Corrections : Stte attitude (ft.) : 7,000 <br />Rated capacity (nom. heaped) : 5.750 LCY Truck Loader Source <br />Descr.: Loose material - 1/8° to 3r8" (90 - 95%) Altitude adj.: >.000 1.000 (Cat H8) <br />Bucket fill factor : 0.925 Job eficiency : 0.830 0.830 (1 shi0/day) <br />Adjusted bucket capacity : 5.319 LCY Net conection : 0.830 0.830 . <br /> <br />Total cost : $0 <br />