Laserfiche WebLink
Golder observed placement of CR. These materials were placed in accordance with the drawings <br />and specifications into excavated or open underground workings. Materials supplied met <br />specifications. <br />• Golder observed placement of geogrid in Phase IVb. Geogrid was placed in accordance with the <br />drawings and specifications over the designated azea. <br />Laboratorv Test Results <br />Golder obtained sample SLFa-02 from Soil Liner Fill placed in the Phase IVa area and began <br />laboratory testing. Golder obtained two samples of LDF (LDFa-O1 and LDFa-02). LDFa-O1 failed <br />to meet the specifications. SLFa-02 and LDFa-02 met the requirements of the specifications and <br />results aze presented in Attachment B. <br />Meetines <br />CC&V held Weekly Contractors meetings on May 215` and May 28a'. Items discussed include <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on June 4a', 2002 <br />at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br /> <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phase NaSC Mayi9-lunel.dac Golder Associates lnc. <br />