My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - Assocc des <br />June I8a', 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 55: June 2 through June 15, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVa, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of June 2"a <br />through June 15'x, 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 33° F to 55° F, and highs ranged from 65° F to 90° F. Rain was recorded on May 4a', <br />2002. Weather observations were made on fourteen days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on all fourteen <br />days of this fourteen-day reporting period. <br />Phase IVa <br />Ames placed Structural Fill (SF) in the southwest corner of the Phase IVa area near the ADR building. <br />Ames conducted slope recontouring throughout the southern end of the Phase IVa azea and continued <br />final subgrade prepazation. A Catetpillaz CS563C roller provided compactive effort, while a Mack <br />water truck provided moisture conditioning. <br />Ames continued to haul, place, and conduct final surface preparations on Soil Liner Fill (SLF) in Phase <br />IVa. SLF was hauled and placed below the 9575 road ai the southem end of the Phase Na area. Ames <br />continued to conduct Depth Verification Testing, completing test twenty-four through twenty-nine. <br />Ames continued excavation of the anchor trench azound the northeast end of Phase IVa in prepazation <br />for geomembrane deployment. Ames excavated a three foot deep by two foot wide trench and <br /> <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.