backfilled the trench using approved material over installed geomembrane. <br />Ames continued construction of the Phase IVa Primary Underdtain (PU) at the southern end of Phase <br />• Na. Ames excavated trench, placed geotextile and UF, completing the construction of the Phase Na <br />PU. Ames continued construction of the Phase Na PU sump by placing 40-mil geomembrane, <br />Bedding Fill, and 12-inch PCPE pipe. <br />Ames began placement of Drain Cover Fill (DCF) in the Phase Na area on June 6~'. Ames began <br />placement of DCF on the 9640 bench in Upper Arequa Gulch working from the north to the south. <br />Ames continued excavation and construction of the Phase Na Leak Detection Fill (LDF). Ames <br />excavated a 1 foot by 1 foot trench, placed 40-mil LLDPE liner, placed 12 oz geotextile, and placed <br />Leak Detection Fill. At geomembrane splices Ames had POLYFLEX extrusion weld the seam. <br />Ames continued construction of the Permanent Diversion Channel by placing Type H riprap at the inlet <br />to the 84-inch CSP. <br />POLYFLEX continued to receive 80-mil geomembrane for Phase Na and began to receive 100-mil <br />geomembrane for Phase Nb. <br />POLI'FLEX continued deployment of 80-mil LLDPE geomembrane. POLYFLEX deployed 80-mil <br />single-sided textured LLDPE geomembrane over an azea of 186,388 sf during this reporting period. <br />Geomembrane panel P-85 through P-135 were deployed, seamed, and tested by POLYFLEX. <br />Destructive seam samples DF-30 through DF-52 and DX-3 through DX-5 were mazked, removed, and <br />tested. <br />Ames did not perform confirmation drilling in the Phase Na azea during this reporting period. <br />Phase Nb <br />Ames continued Structural Fill (SF) placement and compaction activities above the 9640 road between <br />stations 2+00 and 8+00. Structural Fill materials were placed in horizontal lifts typically not exceeding <br />2 feet in loose thickness. A Catezpillaz CS563C roller provided compactive effort, while a Caterpillaz <br />water wagon provided moisture conditioning when needed. Ames continued recontouring the Phase III <br />ore slope on the South side of the Phase N PSSA in prepazation for Bedding Fill (BF} placement. <br />Ames continued construction of the Phase Nb/c Temporary Diversion Channel on June 6s' by <br />beginning trench excavation for the 36-inch CSP. Ames excavated, bedded, assembled, placed thrust <br />blocks, and backfilled the entire length of the CSP. Ames also constructed the plunge pool at the outlet <br />of the 36-inch CSP by excavating the pool, placing Granulaz Filter Material (GFM), and placing Type L <br />riprap. Prepazation for the construction of the inlet structure also began during this reporting period. <br />Ames performed excavation remediation activities of known underground workings UG-214 and UG- <br />215. The workings were observed and verified to be "Deep" as defined in the drawings and will be <br />remediated accordingly. <br />u <br />rn~,~rvassmMz-isa« Golder Associates Inc. <br />