Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ames performed confirmatory drilling activities associated with the Phase Nb construction azea on <br />known underground working UG-263. <br />Ames continued placement of Coazse Shaft Backfill (CSB) into "Deep" underground workings UG- <br />204. <br />Ames continued placement of Concrete Plug (CP) concrete into "Deep Shafts" UG-204 and UG-206. <br />Ames placed three feet of concrete in accordance with IFC Drawing 12, Detail I. <br />Ames placed Cemented Rockfill (CR) at UG-247 by tapering the working and placing 7 feet of CR in <br />accordance with IFC Drawing 12, Detail 1. <br />Ames constructed a geogrid cap over UG-265. Ames placed two layers of geogrid in accordance with <br />the drawings and specifications. <br />Ames resumed SF blast drilling in the Phase Nb at Temporary Diversion Channel and blasted on May <br />13a' at 16:30. <br />Phase IVc <br />Ames placed Structural Fill (SF) in the Phase Nc azea at the saddle berm neaz UG-242. Structural Fill <br />materials were placed in horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillaz <br />CS563C roller provided compactive effort, while a Caterpillaz water wagon provided moisture <br />conditioning when needed. Ames used Structural Fill to backfill over remediated "Deep" working UG- <br />257. <br />• Ames performed excavation remediation activities of known underground working UG-279. This <br />working was observed and verified to be a "Deep" as defined in the drawings and will be remediated <br />accordingly. <br />Ames performed confirmatory drilling activities associated with the Phase Nc construction area on <br />known underground working UG-279. <br />Ames continued blast drilling of underground workings within Phase Nc at UG-279. Ames blasted <br />underground workings delineated by confirmation drilling at UG-253 on May 9`" at 12:30 and at UG- <br />279 on May 14a' at 16:30. <br />(See Attachment A for approximate construction locations for all Phase N azeas.) <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />areas was observed. Golder conducted temperature measurements of fill material prior to placement. <br />Golder observed recontouring of the Phase III ore slope. Ore was regraded to approximately 4H:1 V <br />• Phase 1W 5l Mays-IB.dw Golder Associates Inc. <br />