My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 53 Page 2 <br />Ames resumed construction of the Phase Na Primary Underdrain (PU) through the central portion of <br />Phase Na. Ames excavated trench and completed the tie-in of the Secondary Underdrain. <br />Ames continued to remove Drain Cover Fill (DCF) from the edge of Phase I along the Phase UPhase <br />Na tie-in in preparation for final grading. <br />Ames continued to receive 80-mil geomembrane in prepazation for Phase Na geomembrane <br />deployment. <br />POLYFLEX arrived on-site May 10~' and began deployment of 80-mil LLDPE geomembrane on May <br />17a' at 13:00. POLYFLEX deployed 80-mil single sided textured LLDPE geomembrane over an azea <br />of 107,100 sf during this reporting period. Geomembrane panel P-1 through P-32 were deployed, <br />seamed, and tested by POLYFLEX. Destructive seam samples DF-1 through DF-10 were marked for <br />testing. <br />Ames performed excavation remediation activities of known underground working UG-445 and UG- <br />446. Both of these workings were removed by slope recontouring. <br />Ames resumed SF blast drilling in the Phase Na at "D10 Hill" and blasted on May 9`" at 16:15. <br />Ames did not perform confirmation drilling in the Phase IVa area during this reporting period. <br />Phase IVb <br />Ames continued Structural Fill (SF) placement and compaction activities at the PSSA haul road, at the <br />9640 road between station 2+00 and 8+00, and at the westem perimeter berm. Structural Fill materials <br />were placed in horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillar CS563C <br />roller provided compactive effort, while a Caterpillar water wagon provided moisture conditioning <br />when needed. Ames conducted slope recontouring activifies at the central portion of the temporary <br />diversion channel and in the PSSA sump area. Ames continued recontouring the Phase III ore slope on <br />the South side of the Phase N PSSA in preparation for Bedding Fill placement. Ames used Structural <br />Fill to backfill over remediated "Deep" working UG-247. <br />Ames continued to construct the Phase Nb PU through the central portion of the PSSA and working <br />West towazd Highway 67. Ames blasted and excavated the trench and placed geotextile, Underdrain <br />Fill (UF), and Select Structural Fill (SSF) for approximately 150 feet of PU. Ames completed <br />construction of the central and westem Phase Nb Secondary Underdrains (SU) as generally located on <br />the drawings. <br />Ames continued to remove Drain Cover Fill (DCF) from the edge of Phase III along the Phase III/Phase <br />Nb tie-in in prepazation for final grading. <br />Ames performed excavation remediation activities of known underground working UG-206. This <br />working was observed and verified to be a "Deep" as defined in the drawings and will be remediated <br />accordingly. <br />~~ rve s3 nns-~a m< Golder Associates Inc. <br />