My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - Assoca~ates <br />May 2151, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 53: May 5 through May 18, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of May 5`s <br />through May 18a', 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 21° F to 40° F, and highs ranged from 55° F to 76° F. Rain was recorded on May 17's, <br />2002. Weather observations were made on twelve days of this fourteen-day reporting period. <br />Construction Svnonsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on twelve days of <br />this fourteen-day reporting period (May 6`s through May l la' and May 13ei through May 18a'). <br />Phase Na <br />Ames did not place Structural Fill (SF) in the Phase Na azea during this reporting period. Ames <br />conducted slope recontouring throughout the Phase Na azea and continued final subgrade prepazation. <br />A Caterpillaz CS563C roller provided compactive effort, while a Mack water truck provided moisture <br />conditioning. <br />Ames continued to haul, place, and conduct final surface prepazations on Soil Liner Fill (SLF) in Phase <br />Na. SLF was hauled and placed in Arequa Gulch. Ames began to conduct Depth Verification Testing <br />on May 15s' completing test one through four. Ames began excavation of anchor trench on May 15's in <br />preparation for geomembrane deployment. <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />