My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51440
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report-Summary Report No. 53
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase [V Weekly Summary No. 55 Paged 003-2203 <br />drawings and specifications into excavated or open underground workings. Materials supplied met <br />specifications. <br />Golder observed placement of geogrid in Phase PJb. Geogrid was placed in accordance with the <br />drawings and specifications over the designated azea. <br />Golder and CC&V conducted a final walkthrough of deployed geomembrane panels P-1 through P- <br />85 on June 5`s. The final walkthrough included review of all geomembrane paperwork, as-built <br />survey, and physically walking the entire area seam by seam. This area was approved for Drain <br />Cover Fill placement. <br />Laboratory Test Results <br />Golder obtained three samples of SLF (SLFa-03 through SLFa-OS), two samples of DCF (DCFa-O1 <br />and DCFa-02), one sample of Pipe Bedding Fill (PBFa-Ol), and ona sample of GFM (GFMb-Ol). <br />The samples tested met the requirements of the specifications and results are presented in <br />Attachment B. <br />Meetin¢s <br />CC&V held Weekly Contractors meetings on June 4a' and June lla'. Items discussed included <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on June 18`", <br />2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />,~n~z-~s.aa Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.