Laserfiche WebLink
<br />Since the property immediately adjoins Highway 149 there is no need to build a road. <br />The majority if not all the soil will be removed during a one month period during the Fall <br />of 07. The amount of water to be used would be determined by the APEN and is available <br />from the City of Creede. <br />